Similar Projects
Airport Helipads - City of Concord
New Construction, Infrastructure
Conception
$410,000 est. value
Concord, NC 28027

Academy Recreation Center/Gibson Village Complex Development - Phase I - City of Concord
New Construction, Renovation, Infrastructure
Conception
$1,190,000 est. value
Concord, NC 28025

Davidson Highway Industrial
New Construction, Infrastructure - 139,800 SF
Design
$75,000,000 CJ est. value
Concord, NC 28027

Davidson Highway Industrial
New Construction, Infrastructure - 139,800 SF
Design
$75,000,000 CJ est. value
Concord, NC 28027

Grading, Drainage, Paving, Signals, and Structures
Infrastructure
Bidding
$4,000,000 CJ est. value
Concord, NC 28027

Construction of Concrete Curb Ramps and Retrofitting Existing Ramps
Infrastructure
Bidding
$300,000 CJ est. value
Concord, NC 28025

Substation T
Infrastructure
Post-Bid
Concord, NC

FY23 ADA Improvements
Infrastructure
Post-Bid
$267,991 CJ est. value
Harrisburg, NC 28075

Parking Lots and Roadway Improvements
Infrastructure
Results
$1,138,757 CJ est. value
Mount Pleasant, NC 28124

David Phillips Community Center Terraced Garden
Infrastructure
Results
$728,839 CJ est. value
Concord, NC 28025

R. Brown McAllister Elementary School - Early Release Packages
New Construction, Infrastructure - 116,000 SF
Construction
$37,000,000 CJ est. value
Concord, NC 28025

Christenbury Village
New Construction, Infrastructure - 102,000 SF
Construction
$94,000,000 CJ est. value
Concord, NC 28025

Lakeshore Corporate Park
New Construction, Infrastructure - 660,000 SF
Pending Verification
$49,000,000 CJ est. value
Kannapolis, NC 28082

Lakeshore Corporate Park
New Construction, Infrastructure - 660,000 SF
Pending Verification
$49,000,000 CJ est. value
Kannapolis, NC 28082

South Development Apron Expansion Phase 2 - City of Concord
Renovation, Infrastructure
Conception
Less than $10,904,589 est. value
Concord, NC 28027

Last Updated 04/07/2023 09:05 AM
Project Title

Highway 73 Industrial

Physical Address View project details and contacts
City, State (County) Concord, NC 28027   (Cabarrus County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $225,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of 2 industrial buildings totaling 419,000 square feet. As of April 2023, the project is in the early design stages, and received City Council rezoning approval in October 2022. The project will go before the Planning and Zoning Commission on April 18, 2023 for special permit use approval. Information regarding a general contractor has not been provided. A firm timeline has not been announced. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

419,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents