Similar Projects
The Baltimore-Washington SCMAGLEV Project
Conception
$15,000,000,000 est. value
Washington, DC - Baltimore, MD

Smyth - 047 New Tilt Cars
Bidding
Washington, DC

Air, Fuel, Oil And Lubricant Related Filter Products
Bidding
Washington, DC

Washington Union Station Rehabilitation of Track 22
Renovation
Post-Bid
Washington, DC 20002

WMATA Platform Rehabilitation Program Phase 3
Post-Bid
$280,000,000 to $450,000,000 est. value
Washington, DC 20001

Station Platform Rehab - Phase 2 (RFP)
Results
Washington, DC

SSY Frequency Converter Upgrade
Bidding
Washington, DC

Amtrak WTY HSR Ready Track Expansion
New Construction
Post-Bid
Washington, DC

Toll Management
Bidding
Washington, DC

Diesel Exhaust Fluid Tanks
Renovation
Post-Bid
Washington, DC

Vertical Transportation Monitoring Systems
Bidding
Washington, DC

F20164/RCD Platform Rehabilitation Contract 3
Post-Bid
Washington, DC 20001

On-Board Food Service Refrigeration Temperature Monitoring And Logging
Bidding
Washington, DC

Train Wash SOGR
Renovation
Post-Bid
Washington, DC

Automatic Doors Replacement
Bidding
Washington, DC

Reported 10/02/2020 12:00 AM
Project Title

WMATA Platform Rehabilitation Program Phase 4

Physical Address View project details and contacts
City, State (County) Washington, DC 20001   (District of Columbia County)
Category(s) Transportation
Sub-Category(s) Railroad/Subway
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $280,000 to $450,000
Plans Available from Municipal Agency - 10/01/20
Owner View project details and contacts
Architect View project details and contacts
Description

The Washington Metropolitan Area Transit Authority (WMATA) is seeking a Design Builder interested in providing design, construction and fabrication services for WMATA’s Platform Rehabilitation Program Phase 3 and 4. WMATA will award contracts to separate Design/Build Teams for each phase. Below is a list of stations included in each phase: - Phase 3 will take place in six (6) stations located on the Green and Blue Lines – Arlington Cemetery, West Hyattsville, Prince George’s Plaza, College Park, Greenbelt, and Addison Road Metrorail Stations. - Phase 4 will take place in five (5) stations located on the Orange Line – New Carrollton, Landover, Cheverly, Deanwood & Minnesota Ave Metrorail Stations.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents