Similar Projects
Route 23 Corridor Safety Improvments Chester Co
Infrastructure
Conception
$1,727,000 CJ est. value
Elverson, PA 19520

Route 23 Corridor Safety Improvments Chester Co
Infrastructure
Conception
$1,727,000 CJ est. value
Elverson, PA 19520

Ewing Road /White Clay Creek
Demolition, New Construction, Infrastructure
Design
$1,808,000 CJ est. value
Cochranville, PA 19330

Ewing Road /White Clay Creek
Demolition, New Construction, Infrastructure
Design
$1,808,000 CJ est. value
Cochranville, PA 19330

Boot Road over Amtrak
Infrastructure
Bidding
$10,000,000 CJ est. value
Coatesville, PA 19320

Boot Road over Amtrak
Infrastructure
Bidding
$10,000,000 CJ est. value
Coatesville, PA 19320

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Township Interim Road and Maintenance Services
Infrastructure
Post-Bid
Kemblesville, PA

Skin Patching Project
Results
$12,330 est. value
Nottingham, PA

Willis Lane Stormwater Pipe Repair Project
Infrastructure
Results
Strafford, PA 19087

Tabas Lane Mixed-Use / West Whiteland Township
New Construction, Infrastructure - 13,297 SF
Pending Verification
$3,000,000 CJ est. value
Exton, PA 19341

Honey Brook Residential / Arbor's Edge
New Construction, Infrastructure
Pending Verification
$96,000,000 CJ est. value
Honey Brook, PA 19344

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

West Bridge Street O/AMTRAK
Demolition, New Construction, Infrastructure
Design
$6,800,000 CJ est. value
Parkesburg, PA 19365

Asphalt Resurfacing
Infrastructure
Post-Bid
PA

Last Updated 03/30/2023 10:05 AM
Project Title

Sidley Road/Mill Lane trail connector to the Chester Valley Trail

Physical Address View project details and contacts
City, State (County) Charlestown Township, PA 19355   (Chester County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Request for Qualifications, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 14, 2022, a design engineer has been selected. *The previous solicitation is listed below for reference Requests for clarification are due Monday, April 4, 2022 4:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)]. East Whiteland Township is located in Chester County, PA approximately 25 miles from Philadelphia and proximate to King of Prussia and the Main Line. The Township is largely a developed suburban community and a regional employment center. Infill development and redevelopment is beginning to take place. The Township enjoys a strong road network for vehicular traffic (PA Turnpike, Route 202, Route 29, and Route 30/Lancaster Avenue). Two rail lines (one freight and one passenger) traverse the Township, but there are no train stations. The Chester Valley Trail also crosses the mid-section of the Township in an east-west direction with a handful of direct connections to residential neighborhoods, parks, and other destinations. Pedestrian and bicycle circulation is difficult in most of the Township and improving it is a goal of the community. More specifically, the Township desires to design, engineer, and ultimately construct direct connections to the Chester Valley Trail from various Township neighborhoods. Accordingly, East Whiteland Township is soliciting professional qualifications from engineering consultants for a one-time contract to perform professional services related to survey, preliminary engineering, permitting, and final design for a multi-surface, multi-use trail along Sidley Road, Moores Road and Mill Lane. The trail is intended to serve the nearby residential neighborhoods and offices as a connection to the Chester Valley Trail. Because of the nature and physical constraints of the proposed trail corridor, there will be multiple solutions (treatments, widths, surfaces, etc.) for the trail. Where feasible the trail shall be 8'-12' in width and constructed with an asphalt surface. Pedestrian signals will be included in the design at the crossing of Route 401 (Conestoga Road) as required. This new trail is supported by the residents of the adjacent Spring Mill Farm neighborhoods, St. Gobain/CertainTeed Corporation (20 Moores Road) and various Township plans and studies. These studies include the 2016 Comprehensive Plan, the draft Parks, Recreation, and Open Space (PROS) Plan, and the Sidley Road to CVT feasibility evaluation study prepared in 2019. These studies all recommend creating pedestrian and bicycle connections from neighborhoods and business centers to the Chester Valley Trail. Questions and comments are to be directed to Steven Brown, Assistant Township Manager at sbrown@eastwhiteland.org. The method of contractor selection has not been determined at this time.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents