Similar Projects
Water Transmission Pipeline
Infrastructure
Bidding
$15,000,000 to $20,000,000 est. value
Sherwood, OR 97140

2022 Re-Pipe
Infrastructure
Bidding
$800,000 est. value
Beaverton, OR 97007

Water System Improvements - Phase I - Collector Well No. 3 - 2022
Infrastructure
Post-Bid
$2,600,000 to $2,900,000 est. value
Boardman, OR

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

Canby And East Streets Watermain Replacement
Infrastructure, Alteration
Results
$450,000 to $500,000 est. value
Klamath Falls, OR 97625

Awbrey Butte Distribution Improvements
Alteration
Results
Bend, OR

Water Distribution Line Replacement Project
Infrastructure
Bidding
Madras, OR

South West 209th Avenue Kinnaman Road to Alexander Street 36-Inch PVC Pipe
Infrastructure
Post-Bid
$150,000 to $200,000 est. value
Aloha, OR 97007

Nixyaawii One
Infrastructure
Results
$4,000,000 est. value
Pendleton, OR

2021 Water System Improvements - Radio Read Meter Replacement
Infrastructure
Bidding
$770,000 est. value
Jacksonville, OR

Washington Way Advanced Utilities
Alteration
Post-Bid
Corvallis, OR 97333

North Pipeline Lateral N1 Relocation at NorthWest Martin Road and Highway 47 for Tualatin Valley Irrigation District
Infrastructure
Results
$25,000 to $100,000 est. value
Forest Grove, OR 97116

Monroe Street Rehabilitation
Infrastructure
Bidding
$355,000 to $375,000 est. value
Harrisburg, OR 97446

Drinking Water Distribution System Replacement Project
Term Contract
Post-Bid
Bly, OR

Aloha INN PSH Civil Work
Infrastructure
Results
$65,000 est. value
Hillsboro, OR

Reported 04/16/2022 12:00 AM
Project Title

Valve and Fitting

Physical Address View project details and contacts
City, State (County) Springfield, OR   (Lane County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

50- 2" Gate valve FIPT x FIPT resilient seat epoxy coated 5- 4" Gate valve MJ x F resilient seat epoxy coated in and out 6- 4" Gate valve MJ x MJ resilient seat epoxy coated in and out 4- 4" Gate valve F x F resilient seat epoxy coated in and out 50- 6" Gate valve MJ x F resilient seat epoxy coated in and out 20- 6" Gate valve MJ x MJ resilient seat epoxy coated in and out 10- 6" Gate valve F x F resilient seat epoxy coated in and out 40- 8" Gate valve MJ x F resilient seat epoxy coated in and out 20- 8" Gate valve MJ x MJ resilient seat epoxy coated in and out 10- 8" Gate valve F x F resilient seat epoxy coated in and out 1- 10" Gate valve MJ x F resilient seat epoxy coated in and out 8- 12" Butterfly valve MJ x F 4- 12" Butterfly valve MJ x MJ 1- 12" Butterfly valve F x F 6- 6" Adapter MJ x F 6- 8" Adapter MJ x F 6- 6" x 2" FIPT Blind flange 6- 8" x 2" FIPT Blind flange 6- 12" x 2" FIPT Blind flange 8- 4" 90 Bend MJ x MJ 2- 4" 90 Bend MJ x F 15- 6" 90 Bend MJ x MJ 6- 8" 45 Bend MJ x MJ 10- 8" 90 Bend MJ x MJ 4- 8" x 18" Long offset MJ x MJ 2- 8" x 12" Long offset MJ x MJ 4- 6" x 6" Tee F x F 2- 6" x 6" Tee MJ x F 4- 8" x 8" Tee F x F 2- 8" x 8" Tee MJ x F 300- 910 valve box 18" long 300- 910 valve lid marked "water" 200- VC212 self-centering valve cover

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents