Similar Projects
Relocatable classroom building in summer/fall 2023
Renovation
Design
$1,000,000 CJ est. value
Irvine, CA 92606

Relocatable classroom building in summer/fall 2023
Renovation
Design
$1,000,000 CJ est. value
Irvine, CA 92606

Newport Harbor High School Theater Technology Systems Upgrade
Renovation
Bidding
$1,500,000 CJ est. value
Newport Beach, CA 92663

Sitework for New Modular Team Changing Building at El Modena High School
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Orange, CA 92869

Advanced Learning Academy Campus Modernization - Doors Project (Rebid)
Renovation
Sub-Bidding
$530,000 CJ est. value
Santa Ana, CA 92706

Advanced Learning Academy Campus Modernization - Doors Project (Rebid)
Renovation
Sub-Bidding
$530,000 CJ est. value
Santa Ana, CA 92706

New Administration Building / MPR Modernization / New Parking Lot / New Playground
New Construction, Infrastructure
Post-Bid
$3,500,000 est. value
Buena Park, CA 90621

Anaheim High School Buildings 1 and 2 Hydronic Piping Retrofit
Renovation
Post-Bid
$400,000 CJ est. value
Anaheim, CA 92805

Ambuehl Elementary School Modernization
Renovation
Results
$2,500,000 est. value
San Juan Capistrano, CA 92675

Saddleback High School CTE Digital Media Lab
Renovation
Results
$90,000 est. value
Santa Ana, CA 92707

Portable Building Relocation Project
Renovation
Construction
$1,450,000 CJ est. value
Tustin, CA 92780

RFQ - Villa Park High School - Phase 2: New Classroom Building and Building 100/200 Modernization
Demolition, New Construction, Renovation, Infrastructure
Construction
$26,659,000 CJ est. value
Villa Park, CA 92861

St. Mary's School International Baccalaureate (IB) World School
Demolition, New Construction, Infrastructure - 28,000 SF
Design
$8,000,000 CJ est. value
Aliso Viejo, CA 92656

Barton Library Repair
Renovation
Bidding
$182,500 CJ est. value
Anaheim, CA 92804

Construction Management Services
New Construction
Post-Bid
Anaheim, CA

Last Updated 01/03/2024 07:34 AM
Project Title

Restroom Renovations at Multiple Sites Phase 2

Physical Address View project details and contacts
City, State (County) Orange, CA 92866   (Orange County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected October 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $3,490,058 [brand] Estimate
Plans Available from Copy Center - 07/14/22
Owner View project details and contacts
Architect View project details and contacts
Description

This project scope of work includes but is not limited to the following: Demolition and replacement of all toilet/urinal partitions, toilets with sensor flush valves, water free urinals, toilet accessories, sinks, faucets, p-traps, water lines, and shut off valves. New paint on walls and ceiling, protect in place fire alarm system, saniglaze on wall tiles/terrazzo only, and epoxy on all floors To bid on this Project, the Bidder is required to possess one or more of the following State of California contractors' license(s): B The Bidder's license(s) must remain active and in good standing at the time of bid and throughout the term of the Contract. To bid on this Project, the Bidder is required to be registered as a public works contractor with the Department of Industrial Relations pursuant to Labor Code section 1725.5. The Bidder's registration must remain active at the time of bid and throughout the term of the Contract. Any claim by a bidder of error in its bid must be made in compliance with section 5100 et seq. of the Public Contract Code. Note: The District's Purchasing Department is located at the rear corner of this site. Locator signage is posted at the site entrance. Parking can be difficult at times due to site activities. Pursuant to Public Contract Code section 20111.6, only prequalified bidders will be eligible to submit a bid for the Project. See Instructions to Bidders for further details on which bidders must be prequalified. Any bid submitted by a bidder who is not prequalified shall be deemed nonresponsive and returned unopened to the bidder. Moreover, any bid listing subcontractors holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 licenses ("MEP" subcontractors) who have not been prequalified, shall be deemed non-responsive and will not be considered. It is the sole responsibility of the bidder to ensure that all MEP subcontractors holding any of the licenses listed above are properly prequalified before submitting a bid. This prequalification requirement applies even if the MEP subcontractor will perform, or is designated to perform, work that does not require one of the licenses listed above, but the MEP subcontractor holds one of the licenses listed above. The deadline for submittal of District Prequalification Packages for this Project to the District for review shall be pursuant to Public Contract Code section 20111.6(f), at least 10 business days before the date fixed for the public opening of sealed bids. Bidders and MEP subcontractors must be prequalified at least five business days before the date fixed for the public opening of sealed bids. Prequalification documents are available online with Quality Bidders at: The deadline for submission of prequalification documents for this Project must be submitted online to Quality Bidders no later than 4:00 p.m. on July 28, 2022. Prime Contractors, and M/E/P Subcontractors listed in this Notice to Bidders will be notified by e-mail of their prequalification rating not less than five (5) business days prior to the bid opening date. A Master list of prequalified Prime Contractors, and M/E/P Subcontractors will also be posted with the bid documents on ARC. The estimated value of this project is in excess of $5 million. Interested bidders shall refer to the District's prequalification requirements on Quality Bidders for all requirements. All bids shall be on the form provided by the District. Each bid must conform and be responsive to all pertinent Contract Documents, including, but not limited to, the Instructions to Bidders. A bid bond by an admitted surety insurer on the form provided by the District, cash, or a cashier's check or a certified check, drawn to the order of the Orange Unified School District, in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the Contract for the Work. The successful Bidder may substitute securities for any monies with- held by the District to ensure performance under the Contract, in accordance with the provisions of section 22300 of the Public Contract Code. The successful bidder will be required to certify that it either meets the Disabled Veteran Business Enterprise ("DVBE") goal of three percent (3%) participation or made a good faith effort to solicit DVBE participation in this Contract if it is awarded the Contract for the Work. The Contractor and all Subcontractors under the Contractor shall pay all workers on all Work performed pursuant to this Contract not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to section 1770 et seq. of the California Labor Code. Prevailing wage rates are also available on the Department of Industrial Relations ("DIR") This Project is subject to labor compliance monitoring and enforcement by the Department of Industrial Relations pursuant to Labor Code section 1771.4 and subject to the requirements of Title 8 of the California Code of Regulations. The Contractor and all Subcontractors under the Contractor shall furnish electronic certified payroll records directly to the Labor Commissioner weekly and within ten (10) days of any request by the District or the Labor Commissioner. The successful Bidder shall comply with all requirements of Division 2, Part 7, Chapter 1, Articles 1-5 of the Labor Code. The District shall award the Contract, if it awards it at all, to the lowest responsive responsible bidder based on: A. Total Base Bid amount only. The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received or in the bidding. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents