Similar Projects
Reported | 12/18/2019 12:00 AM |
Project Title | Alabama Highway 75 Extension |
Physical Address | View project details and contacts |
City, State (County) | AL (Marshall County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Site Development |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work will consist of a Unit Price Item Contract for furnishing all labor and materials, except as noted, for the following: 19,615 LF of 6-5/8" OD Steel Gas Main, 10,020 LF of 6-5/8" OD Steel Gas Main Installed by Horizontal Directional Drilling, 2 EA - Creek Crossings (1000 and 1800 LF) installed by Horizontal Directional Drilling, 1 Each - 6"Steel Hot-Tap, 10 Each- 6" Steel Valve in Valve Boxes, 1 Each - NPDES Storm Water Permit and Monitoring, 2000 LF of Silt Fence, 1000 Each - Hay Bales, 1000 Ton of Rip Rap, 1000 LF Wattles and other miscellaneous work. MCGD will furnish all steel pipe, fittings, field wrap coating, valves, valve boxes, and casing pipe. The Contractor shall furnish all labor and equipment, including fuel, welding rods and all other expendables, and all other materials not stated above. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |