Similar Projects
34 Hughes Road
New Construction
Conception
Madison, AL 35758

Trillium
New Construction
Conception
Opelika, AL

New St. Clair County Jail - Pell City - Bid Package -1 Civil
Bidding
Ashville, Pell City, AL 35125

Clearing and Grubbing Future School Site
Bidding
AL

Developer Partner for the Redevelopment of Its Rental Assistance Demonstration (RAD) Conversion Sites
Post-Bid
Birmingham, AL 35233

New Supply Warehouse and Jag Tran Building Phase 1 Site Work
Post-Bid
Mobile, AL 36688

Excavation of Twenty Four (24) Inches of Top Soil, Backfilling and Compacting to 95% SPD and Grading the Silverhill Substation Site
Results
Silverhill, AL 36576

Palmer Park Expansion Site Work
Results
Madison, AL 35758

Tiger Corners
New Construction - 12,245 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Auburn, AL 36830

Cannon Gate
New Construction
Construction
Opelika, AL

Elks Lodge
Pending Verification
Tuscaloosa, AL

Towne Lake
New Construction
Conception
Opelika, AL

Clinical Services & Research MRI Addition - Early Foundation
Bidding
$950,000 est. value
Tuscaloosa, AL 35404

Troy, AL - New Tarping Station at P-071 Trailer Parking
Post-Bid
Troy, AL 36081

2020 Annual Contract for Roadway Bores
Term Contract
Results
Less than $266,000 est. value
Mobile, AL 36618-0249

Reported 12/18/2019 12:00 AM
Project Title

Alabama Highway 75 Extension

Physical Address View project details and contacts
City, State (County) AL   (Marshall County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work will consist of a Unit Price Item Contract for furnishing all labor and materials, except as noted, for the following: 19,615 LF of 6-5/8" OD Steel Gas Main, 10,020 LF of 6-5/8" OD Steel Gas Main Installed by Horizontal Directional Drilling, 2 EA - Creek Crossings (1000 and 1800 LF) installed by Horizontal Directional Drilling, 1 Each - 6"Steel Hot-Tap, 10 Each- 6" Steel Valve in Valve Boxes, 1 Each - NPDES Storm Water Permit and Monitoring, 2000 LF of Silt Fence, 1000 Each - Hay Bales, 1000 Ton of Rip Rap, 1000 LF Wattles and other miscellaneous work. MCGD will furnish all steel pipe, fittings, field wrap coating, valves, valve boxes, and casing pipe. The Contractor shall furnish all labor and equipment, including fuel, welding rods and all other expendables, and all other materials not stated above.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents