Similar Projects
Chiller Maintenance Services
Infrastructure
Design
Detroit, MI 48201

HVAC Repairs and Maintenance
Term Contract
Sub-Bidding
Detroit, MI 48202

HVAC Electric Motors and Parts
Term Contract
Sub-Bidding
Romulus, MI 48242

Emergency Restoration Services
Term Contract, Alteration
Post-Bid
MI

BP 2 Allen Park High School and Middle School AC Install
Alteration
Post-Bid
Allen Park, MI 48101

CDBG Emergency Furnace Replacement
Results
Taylor, MI 48180

Grosse Pointe Park Municipal Building HVAC Upgrades
Alteration
Results
Grosse Pointe Park, MI 48230

HVAC Bearings and Repair Parts
Term Contract
Sub-Bidding
Detroit, MI 48242

Ionization Units
Alteration
Post-Bid
New Boston, MI 48164

Burger Baylor Ductwork and HVAC Unit Cleaning
Alteration
Results
Inkster, MI 48141

North Terminal Preconditioned Air Replacement and Electrical Upgrades
Alteration
Post-Bid
Wayne, MI

Annual HVAC Equipment Maintenance Agreement
Term Contract
Results
Dearborn Heights, MI

Electrical Upgrades- HVAC Replacement
Alteration
Post-Bid
Belleville, MI

Recreation Building HVAC Units Replacement
Alteration
Results
Taylor, MI 48180

Boiler Replacement At Seven (7) Sites
Alteration
Post-Bid
Livonia, MI

Last Updated 03/23/2023 11:34 AM
Project Title

Trenton High School Boiler Replacement

Physical Address View project details and contacts
City, State (County) Trenton, MI 48183   (Wayne County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $699,316 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 23, 2023, project was awarded to Engineered Comfort Systems, awarded amount is $699,315.74. Removal of (3) Steam Firetube Boilers and replace with (3) Hot water condensing Boilers and associated breeching, piping and circulation pumps. Replacement of kitchen water heater and associated breeching and circulation pump. Replacement of piping and accessories at incoming water service. Installation of roof mounted exhaust fan and outside air intake duct. All required electrical work to support. Integration of new equipment into existing building management system. Removal/reinstallation of existing exterior wall/window for boiler room access. Roofing work to be coordinated with District preferred roofing contractor, which is being established through a separate, concurrent summer roofing project All contractors have until 12:00 P.M. on February 13, 2023 to submit a Request For Information (RFI). All RFI's shall be directed to Steve Mrak smrak@pbanet.com

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents