Project Title | Milpitas High School - Performing Arts Center (PAC), Second Gym, and Fitness Center - Final GMP Rebid |
Physical Address | View project details and contacts |
City, State (County) | Milpitas, CA 95035 (Santa Clara County) |
Category(s) | Education, Entertainment/Recreation, Heavy and Highway |
Sub-Category(s) | Athletic Facility, Middle/Senior High School, Site Development, Theaters/Auditoriums |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $49,000,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | *As of September 30, 2022, the bid process has closed. Please contact the construction manager for access to the bid results. This is an Overaa project. We are requesting final pricing based on the DSA Backcheck docs provided. Scope: the project consists of construction of a new approximately 38,156 square foot performing arts center with supporting classrooms, a new approximately 18,128 square foot gymnasium and a new 11,088 square foot fitness center. The project will also include associate site work, utility connections, landscape and irrigation. The project will require the removal and relocation of solar parking canopies. Trades include, but are not limited to; Scaffolding, Surveying, Demolition, Concrete Ready-Mix Suppliers, Rebar, Site Concrete & PPF, Concrete Floor Finishes, Masonry, Structural Steel, Metal Decking, Metal Fabrications, Architectural Wood Casework, FRP Plastic Paneling, Waterproofing, Thermal Insulation, Metal Wall Panels, Fiber Cement Siding, Membrane Roofing, Sheet Metal Flashing & Trim, Fireproofing, Firestopping and Joint Seals, Expansion Joints, Doors, Frames & Hardware, Overhead Coiling Doors, Special Doors, Storefronts, Curtain Walls, and Windows, Skylights, Lath & Plaster, Drywall & Framing, Tile, Acoustical Ceilings & Acoustical Insulation, Wood Flooring, Wood Athletic Flooring, Resilient Flooring & Carpet, Fluid Applied Flooring (Epoxy Flooring), Painting & Coatings, Visual Display Boards, Signage, Wall and Corner Protection, Toilet Accessories & Toilet Partitions, Fire Extinguishers & Cabinets, Lockers, Fixed Sun Screens, Theater and Stage Equipment, Athletic & Recreational Equipment, Window Treatments, Multiple Seating, Site Furnishings, Elevators, Fire Protection, Plumbing, HVAC, Electrical, Communications, Earthwork, Grading, & Asphalt Paving, Athletic Surfacing, Pavement Markings, Fences & Gates, Landscape, and Site Utilities DVBE participation is encouraged. Anticipated construction start: July 2022 Anticipated construction completion: December 2023 PLA agreement in place. Breakout pricing as follows for accounting purposes: Site Work Performing Arts Center (building T) 2nd Gym (building N) Fitness Center (building M) Two Alternates: 1. Building M – Fitness Building and associated site work. Including ramp northwest of proposed Building N (Gym) on sheet 19/L3.01. 2. Installation of electric vehicle charging station(s). |
||||||||||||||||||||||||||||||||||||||||||
Details | 38,156 SF - 38,156 SF. 29,216 SF.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |