Similar Projects
San Souci Road Elevation Design
Infrastructure
Design
WA

CRT5 Repair Construction
Alteration
Design
$1,000,000 est. value
WA

SR18 Et AL, Northwest Region HMA Crack Seal and Pavement Repair
Infrastructure
Bidding
$2,000,000 to $2,500,000 est. value
Covington, WA 98042

2022 Pavement Management Program - Overlay Project
Infrastructure
Bidding
$740,000 to $960,000 est. value
Burien, WA

Transit Facility Improvements Work Order
Infrastructure
Post-Bid
WA

150Th Ave Se / Se 38Th St To Eastgate Way - Roadway Improvements
Infrastructure
Post-Bid
Bellevue, WA

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

SR 516 - Jenkins Creek to 185th Pl SE
Infrastructure
Results
Covington, WA 98042

I-405/SR 522 to SR 527 - Widening and Express Toll Lane
Infrastructure
Design
$510,000,000 est. value
Bothell, WA 98011

2022 Overlay Project
Infrastructure
Bidding
$300,000 est. value
Renton, WA

West Valley Highway (Strander Boulevard to I-405)
Infrastructure
Post-Bid
$3,400,000 to $4,000,000 est. value
Tukwila, WA

124th Avenue NE- NE 12th Street to NE Spring Boulevard
Infrastructure
Results
$8,221,853 est. value
Bellevue, WA 98007

North East Old Cascade Highway
Infrastructure
Bidding
$580,000 est. value
Skykomish, WA

UST Inspect Maintain and Repair
Alteration
Post-Bid
$1,000,000 est. value
WA

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Results
WA

Reported 07/01/2022 01:35 PM
Project Title

2022 SR 99/148th St SW VIC to Evergreen Way - Corridor Improvement

Physical Address View project details and contacts
City, State (County) Seattle, WA 98113   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

County: Statewide The Washington State Department of Transportation (WSDOT) solicits interest from consultants who wish to be evaluated and considered to provide services related to the design, development, and delivery of SR 99/148th St SW VIC to Evergreen Way - Corridor Improvements. The main driver for this project is a business access and transit (BAT) lane for Community Transit's Swift Blue line. The project includes one (1) fish barrier, widening and reconstruction of existing shoulders, providing concrete pads for planned transit stops, placing raised islands to improve operations and safety, adding curbed sidewalks/ADA improvements, paving, striping work, retaining walls/bridge structure, stormwater conveyance systems, stormwater treatment facilities, ITS, signal, and illumination. The agreement will be approximately four (4) years in duration and will total a combined agreement amount of approximately $1.0 to $2.5 million with the option for WSDOT to supplement for additional time and money if necessary. The method of contractor selection has not been determined at this time. WADOT - 2022 SR 99/148th St SW VIC to Evergreen Way - Corridor Improvement

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents