Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

USPS IQ JOC - Alabama
Renovation
Bidding
$10,000 to $10,000,000 est. value

New Space Camp Operations Building
New Construction
Bidding
Huntsville, AL 35805

Two-Phase South Region Unrestricted MATOC, Mobile District AOR
Post-Bid
$100,000,000 to $250,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

New Public Works Building
New Construction - 19,595 SF
Construction
Madison, AL

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

D/B Southeast MATOC - Phase 2
Post-Bid
$1,000,000 to $170,000,000 est. value

Johnson Legacy Complex
Renovation
Results
Less than $5,245,000 est. value
Huntsville, AL 35810

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Design
$250,000 to $5,000,000 est. value

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Post-Bid
Less than $150,000,000 est. value

Reported 07/11/2020 12:00 AM
Project Title

JOC Job Order Contract at Redstone Arsenal

Physical Address View project details and contacts
City, State (County) Redstone Arsenal, AL 35898   (Madison County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000 to $50,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: 8(a) Set-Aside (FAR 19.8). The Federal Bureau of Investigation (FBI) requires general construction support for new construction and for the sustainment, restoration, and modernization of buildings, structures, or other real property at Redstone Arsenal, Huntsville, Alabama. The FBI is requesting general construction services to upgrade/install services to support the FBI at various locations on Redstone to include, but not limited to, the FBI North Site, Interim Training Center Compound and FBI South Site. Each project will be awarded as an individual task order (referred hereafter as “order”) issued against the basic contract, specifying real property maintenance, repair, alteration, and/or new construction. The Contractor shall furnish all materials, equipment and personnel necessary to manage and accomplish the work. The Contractor shall provide sufficient technical support and project management to assure quality, accuracy of estimates, accommodate a number of concurrent “active” projects, provide flexibility of design staff and subcontractor pool to handle rapid increases in work volume, perform according to schedule (including completion on time), and process submittals and payrolls in a timely manner. The Contractor's work responsibility shall include all contractor planning, programming, administration, coordination, and management necessary to provide all work as specified. The work shall be conducted by the Contractor in strict accordance with the contract and all applicable Federal, State, and local laws, regulations, codes, or directives. The Contractor shall ensure that all work provided meets, or exceeds critical reliability rates or tolerances specified or included in applicable documents. The Contractor shall provide related services such as pre award project development; project management; quality control (QC); preparation, review, and submission of required deliverables, and performance of all associated administrative work required to satisfy requirements specified under this contract and individual orders. Construction Support. The contractor shall furnish the necessary labor, equipment, and materials for various general construction works project to support FBI FFD. As necessary to provide the work, this contract shall include and incidental architectural and engineering services necessary. Additionally, in many renovation efforts the FBI will require a “turn-key” solution to include all furniture, fixtures and equipment. In those cases, the contractor may use General Services Administration (GSA) schedule vendors and pricing. A letter of authorization to use GSA schedule pricing will be provided to the contractor. Contractor must adhere to FBI’s operations and maintenance guidelines. Typical task orders may include repair and maintenance of real property, alteration and/or new construction. Specific tasks include, but are not limited to: door replacement and door hardware installation to include conduit; building automation; fencing; underground conduits; general carpentry; repair and replacement of HVAC, water, and sewer systems; security monitoring systems; fire control and suppression system upgrades; paving; concrete work; roofing; landscaping; interior and exterior painting; ceiling repairs or replacements; repair or replacement of floor coverings; renovations; refurbishments; civil works; and electrical repairs involving all types of building crafts and trades. Routine Maintenance and Improvements Outside of Garrison Provided Services. Typical work under this section may include, but not be limited to tasks such as outside building power washing, window cleaning, and street sweeping, parking restriping, internal cleaning of non-administrative facilities such as warehouses and training villages and general grounds maintenance. General grounds maintenance may include mowing services, parking lot cleaning, landscaping and establishment of ground cover. Event Support. Due to ongoing growth of the FBI Redstone footprint and the number of anticipated construction projects to be completed over the next 5 years, the FBI will require a robust support function to accommodate events such as ribbon cuttings. Events will include the rental, set-up and take down of items such as tents, tables, chairs, AV equipment.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents