Similar Projects
Le Bon Vivant
New Construction - 21,877 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Wauwatosa, WI 53213

Avenir Apartment Homes Phases II & III
New Construction - 96,557 SF
Conception
$26,000,000 est. value
Milwaukee, WI 53202

Affordable Housing
New Construction
Design
Milwaukee, WI 53201

Kane Building Apartments
Renovation
Design
$1,000,000 to $5,000,000 CJ est. value
South Milwaukee, WI 53172

Remodeling and Repairs at 3741 North 62nd Street
Renovation
Bidding
Milwaukee, WI 53216

Remodeling & Repairs of 2862-2864 South 35th Street
Bidding
Milwaukee, WI 53215

2846 North Frederick Avenue Single Family Residence
Post-Bid
Milwaukee, WI 53211

Remodeling and Repairs for 4250 North 29th Street
Renovation
Post-Bid
Milwaukee, WI 53216

Multi-Family Apartment Buildings 3.2 and 3.3 for Westlawn Renaissance IV at Westlawn Gardens Phase II
New Construction
Results
Glendale, WI 53212

General Contracting - Housing Infrastructure
Renovation
Results
Milwaukee, WI 53208

Ascent Luxury Apartment Tower
New Construction - 492,995 SF
Construction
$80,000,000 est. value
Milwaukee, WI 53202

Phillis Wheatley Redevelopment
Renovation - 63,725 SF
Construction
Milwaukee, WI 53023

Deerwood Estates Condominiums
New Construction
Pending Verification
Franklin, WI 53132

Residential Apartment Building
Renovation
Pending Verification
South Milwaukee, WI 53172

East Side Youth and Child Ministry of Saints Peter and Paul Catholic Church Apartments
Renovation - 30,000 SF
Conception
Milwaukee, WI 53211

Reported 11/12/2021 03:08 PM
Project Title

Lakeshore Commons Multi-Family & Townhomes

Physical Address View project details and contacts
City, State (County) Oak Creek, WI 53154   (Milwaukee County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums, Multi-Family Homes, Single-Family Homes
Contracting Method General Contractor to Subcontract.
Project Status Construction Commenced November 2021, Sitework Commenced November 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

700 housing units; 66 acres; phase one features 290 to 318 apartments, as well as 58 villas, 32 townhome units and 30 single-family homes; later phases would feature 110 apartments, 59 villas, 34 townhomes and 81 single-family homes; city pays for the development's infrastructure, including roads, sidewalks, sewers and water mains; minimum assessed values for Lakeshore Commons of $27.4 million by January 2024 and $81.2 million by January 2027; infrastructure work begins October 1; the first housing unit construction begins in 2022; the single-family houses would be as small as 1,600 square feet, with prices starting in the $300,000s; and shared amenities are to include a clubhouse, fitness center, outdoor swimming pool, walking trails and basketball courts.

Details

Multi-Family Homes, New Construction, 32 Buildings, Multi-Family Homes, New Construction, 58 Buildings, Multi-Family Homes, New Construction, 59 Buildings, Multi-Family Homes, New Construction, 34 Buildings, Apartments/Condominiums, New Construction, 110 Unit(s), Apartments/Condominiums, New Construction, 290 to 318 Unit(s), Single-Family Homes, New Construction, 30 Buildings, Single-Family Homes, New Construction, 81 Buildings.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents