Similar Projects
Design-Build Services for SR 836 New Heft Ramp Connections
Infrastructure
Bidding
$4,768,600 est. value
Miami, FL

Design-Build Services for Roadway Improvements to Bay Vista Boulevard from NE 151 Street to Gwen Margolis Boulevard
Infrastructure
Bidding
$6,472,969 est. value
North Miami, FL 33181

Roadway Improvements to NW 97 Avenue from NW 58 Street to NW 70 Street
Post-Bid
Less than $5,405,820 est. value
Miami, FL 33128

Improvements to Downtown Mobility
Post-Bid
Less than $1,042,751 est. value
Miami, FL 33129

North Cruise Boulevard Extension Phase III
Results
Less than $11,834,424 est. value
Miami, FL

Sunset Drive Modifications
Results
Less than $350,000 est. value
South Miami, FL 33143

Resurfacing/Traffic Signals/Lighting/Sidewalk - SR 932/NW 103 ST/W 49TH ST
Infrastructure
Bidding
$3,581,909 est. value
FL

Traffic Circle Improvements at SW 97 Avenue and SW 120 Street
Post-Bid
Less than $401,933 est. value
Miami, FL 33128

Asphalt and Concrete Maintenance, Site Work and Other Related Work
Results
Miami, FL 33132

Resurfacing/Drainage Improvements/Lighting/Traffic Signals
Infrastructure
Bidding
$7,143,227 est. value
FL

Roadway Improvements to SW 22 Avenue from US-1 to Coral Way
Post-Bid
$559,425 est. value
Miami, FL 33010

Design-Build Services for Roadway Improvements to NE 2nd Avenue
Results
Less than $10,307,626 est. value
Miami, FL 33128

Intersection Improvement/Milling and Resurfacing/Traffic Signals/Lighting
Infrastructure
Bidding
FL

Construction Services for a Roadway Improvement
Post-Bid
Miami Shores, FL 33150

Roadway Resurfacing-Multiple Sites
Results
Less than $2,456,426 est. value
Miami, FL 33128

Last Updated 12/29/2021 06:50 AM
Project Title

SR 826 - Palmetto Expressway Capacity Improvement Project (FPID)

Physical Address View project details and contacts
City, State (County) Miami Lakes, FL 33014   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The SR 826/Palmetto Expressway Capacity Improvement project (FPID 447165-1-52-01) consists of improvements in the southbound direction to retrofit the EL ingress/egress access points and widening to increase capacity between NW 74th Street and NW 103rd Street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents