Similar Projects
The Edge at Davie
New Construction, Build-Out, Demolition - 1,210,110 SF
Conception
$10,000,000 CJ est. value
Davie, FL 33314

Centrum Deerfield Apartments
New Construction
Conception
Deerfield Beach, FL 33441

Atlantic 3350
New Construction - 647,925 SF
Design
$85,000,000 est. value
Pompano Beach, FL 33062

New River Central
New Construction - 588,346 SF
Design
$80,000,000 est. value
Fort Lauderdale, FL 33301

Block 58 - Bread Building
New Construction, Build-Out - 624,026 SF
Post-Bid
$100,000,000 est. value
Hollywood, FL 33020

Nine Hollywood
New Construction - 106,284 SF
Post-Bid
$24,000,000 est. value
Hollywood, FL 33020

Griffin Gardens II - Owner's Representative/Construction Manager
New Construction
Results
FL

Redevelopment of 4271 Peters Road
Renovation
Results
Plantation, FL 33317

Dania Pointe
New Construction - 1,300,000 SF
Construction
$816,200,000 est. value
Dania, FL 33004

Hallandale Oasis
New Construction, Build-Out - 93,910 SF
Construction
$370,000,000 est. value
Hallandale, FL 33009

Ritz-Carlton Residences - Pompano Beach
New Construction, Build-Out
Pending Verification
Pompano Beach, FL 33062

200 Third
New Construction, Build-Out - 471,676 SF
Pending Verification
$10,000,000 CJ est. value
Fort Lauderdale, FL 33301

City Place Apartments
New Construction
Conception
Dania Beach, FL 33004

Main Street Courts
New Construction, Build-Out - 39,456 SF
Design
$2,500,000 est. value
Davie, FL 33314

1818 Madison
New Construction - 22,395 SF
Post-Bid
$2,200,000 est. value
Hollywood, FL 33020

Last Updated 12/15/2021 12:00 AM
Project Title

Tamarac Village - Phase II

Physical Address View project details and contacts
City, State (County) Tamarac, FL 33315   (Broward County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method
Project Status Construction Commenced August 2021, Construction Completion Expected third quarter 2022
Bids Due View project details and contacts
Estimated Value $26,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase II to include the construction of Apartment Buildings 8 - 13, and multiple garages.

Details

6 Apartments/Condominiums, 4 Stories Above Grade, 58,314 SF New Construction 190 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 14 - Conveying Equipment, Elevators.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents