Similar Projects
Soil Stabilization
Infrastructure
Bidding
VA

Design-Build for Stream Restoration Lick Run at Roanoke Regional Airport
Post-Bid
$681,937 est. value
Roanoke, VA 24011

Kessler Mill Drainage Improvements
Post-Bid
Salem, VA

Border Road Drainage Improvements Phase 2B
Results
Chesapeake, VA

Construction of Munden Point Park Shoreline Stabilization
Results
Virginia Beach, VA

Mill Street Drainage Improvements
Post-Bid
Dayton, VA

NASA Wallops Beach Renourishment (Backpassing)
Results
$10,000,000 to $25,000,000 est. value
Wallops Island, VA 23303

Drainage Improvements Fairfax Camp 30 AHQ Maintenance Facility
Post-Bid
Fairfax, VA 22030

Pipe Rehabilitation VDOT Culpeper District
Term Contract
Results

Z--COLO 253093 York River Shoreline Stabilization 2B
Post-Bid
$10,000,000 est. value
Yorktown, VA

Chincoteague NWR, VA Remove and Replace Water Control Structures
Results
Chincoteague, VA

Water Management Infrastructure
Post-Bid
Suffolk, VA 23434

Lynnhaven River Basin Ecosystem Restoration, Phase 1 Reef Habitat
Results
$1,000,000 to $5,000,000 est. value
Virginia Beach, VA

Drainage Repairs at Paul D. Camp Community College, Franklin Campus
Post-Bid
Franklin, VA 23851

Jetty Construction Located on Tangier Island, VA
Results
$1,000,000 to $5,000,000 est. value
Tangier, VA 23440

Last Updated 06/28/2021 02:35 PM
Project Title

William Street Drainage

Physical Address View project details and contacts
City, State (County) Fredericksburg, VA 22401   (Fredericksburg City County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work involves the replacement of existing storm sewer pipe and storm sewer structures within the 100 block of William Street, to include pipe connections across Caroline Street and Sophia Street. Roof and sump-pump connections are to be made to storm structures, The work also includes curb replacement, pavement resurfacing, re-striping, and replacement of brick sidewalk.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents