Similar Projects
127Eaw22r0025 - Stanislaus Multi CG Well Water System
Term Contract
Design
$250,000 to $500,000 est. value
CA

Streamgage Removal
Alteration
Design
Santa Barbara, Wheeler Springs, CA

Air Base Parkway Flood Station and State Street Flood Station Pump Replacement
Infrastructure
Bidding
$319,300 est. value
Fairfield, CA 94533

Drilling and Construction of (4) Monitoring Wells
Infrastructure
Bidding
Tipton, CA

Southern Pump Station Project
Infrastructure
Post-Bid
$6,200,000 est. value
El Centro, CA 92244

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Post-Bid
Colton, San Bernardino, CA 92324

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Treated Water Booster Pumps
Alteration
Results
CA

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Construction
Anaheim, CA

Water Source Test Well Drilling
Term Contract
Design
$250,000 to $500,000 est. value
Independence, CA

Well 32 Rehabilitation
Alteration
Bidding
$13,000,000 est. value
Santa Ana, CA

Well Pumping Plant 31, Fogg Street
Infrastructure
Post-Bid
$1,600,000 to $1,800,000 est. value
Colton, CA 92324

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

Sierra Well Construction Project
Infrastructure
Bidding
Carmichael, CA

Well and Pump Maintenance and Repair
Infrastructure
Post-Bid
$114,000 est. value
Napa, Suisun City, CA 94585

Last Updated 04/06/2022 10:49 AM
Project Title

Mojave Drive and Bellflower Street Dry Well Project

Physical Address View project details and contacts
City, State (County) State-Wide: CA
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $30,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents