Similar Projects
PT Land Apartments
New Construction, Renovation
Conception
Cape Coral, FL 33904

Cape Coral Town Center
New Construction
Conception
Cape Coral, FL 33991

Embers Lake Estates
New Construction - 4,673,403 SF
Design
Cape Coral, FL

Sanibel Passage
New Construction - 76,500 SF
Design
$42,000,000 est. value
Fort Myers, FL 33908

Bowmans Beach Park Changing Area Rehabilitation Project
Demolition, New Construction, Infrastructure - 239 SF
Bidding
$400,000 CJ est. value
Sanibel, FL 33957

Bowmans Beach Park Kayak Launch Replacement Project
Infrastructure
Bidding
$180,000 CJ est. value
Sanibel, FL 33957

Wawa #5237 / Fort Myers
New Construction, Infrastructure - 6,421 SF
Post-Bid
$1,400,000 CJ est. value
Fort Myers, FL 33912

Gulf Coast Town Center
New Construction - 437,301 SF
Post-Bid
$80,000,000 est. value
Fort Myers, FL 33913

Lee Civic Center
Results
Fort Myers, FL 33917

Construction Of Unimproved Alleys
New Construction, Infrastructure
Results
$600,000 est. value
Cape Coral, FL 33909

Prima Luce
New Construction
Construction
$127,000,000 est. value
Fort Myers, FL

Grandview at Bay Beach
New Construction - 150,000 SF
Construction
$10,000,000 CJ est. value
Fort Myers, FL

Cape Coral Yacht Club Renovations - City of Cape Coral
Infrastructure
Pending Verification
$60,000,000 CJ est. value
Cape Coral, FL 33904

RV One Superstore of Fort Myers
New Construction, Infrastructure - 30,000 SF
Pending Verification
$6,750,000 CJ est. value
Fort Myers, FL 33905

Bonita 75 Mpd Multi-Family
New Construction
Conception
Bonita Springs, FL 34135

Last Updated 01/03/2023 09:05 AM
Project Title

Monarch Apartments

Physical Address View project details and contacts
City, State (County) Fort Myers, FL 33916   (Lee County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Project In For Redesign, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $127,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Monarch Apartments features 336 units on a 19-acre parcel. The project consists of three 4-storyresidential building types and two 3-story residential townhouse building types for a total of thirteen 13 residential buildings, clubhouse, pool/amenity areas and pool house. The project also features ancillary buildings consisting of fifteen (15) detached garages, mail kiosk, two (2) pavilions and trash enclosure. As of January 3, 2023, the project is in redesign. The project is expected to rebid for a general contractor in 2024. Construction is not expected to commence prior to the second quarter of 2024.

Details

4 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents