Similar Projects
Jesuit College Preparatory School
Addition
Design
Dallas, TX 75244

Rosedale and New Northeast Middle School Design Build
New Construction
Design
Austin, TX

Construction of a New Waller High School and Waller Junior High School Addition and Renovation
New Construction, Renovation, Addition - 973,998 SF
Sub-Bidding
Less than $120,265,450 est. value
Waller, TX 77484

New CTE Building on the Katy High School Campus
New Construction - 40,000 SF
Post-Bid
Katy, TX 77449

Construction Manager at Risk for the Alvin Independent School District's High School 4
New Construction - 500,000 SF
Post-Bid
Less than $126,500,000 est. value
Alvin, TX

Katy ISD Kitchen Renovations and Floral Cooler Additions at Multiple Campuses
Renovation, Addition
Results
Less than $3,036,000 est. value
Katy, TX 77494

Renovation of Early College to Spring Leadership Academy
Renovation
Results
$2,104,720 est. value
Houston, TX 77014

Prestonwood Christian Academy
Addition
Construction
Plano, TX 75093

Construction of New Middle School
Construction
Stafford, TX 77477

Construction Management at Risk Landrum Middle School Replacement
Renovation - 234,000 SF
Post-Bid
Less than $60,000,000 est. value
Houston, TX

CMAR Services for the Northeast Middle School Project
Results
Less than $35,700,000 est. value
El Paso, TX 79930

Waltrip High School Renovation and Addition
Construction
Less than $35,000,000 est. value
Houston, TX 77018

O D Wyatt High School Renovation
Renovation
Post-Bid
Fort Worth, TX

Addition and Renovations to Central and Hurst Junior High
Renovation, Addition
Results
$27,700,000 est. value
Bedford, TX

Presbyterian Middle School Renovation
Renovation - 22,000 SF
Construction
$2,900,000 est. value
Houston, TX 77004

Last Updated 06/30/2021 10:11 AM
Project Title

Middle School and Other Campus Improvements

Physical Address View project details and contacts
City, State (County) TX 75978   (Nacogdoches County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Nearing Completion, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $7,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed Project consists of Middle School and Other Campus Improvements.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents