Similar Projects
Clinton Avenue Improvements - City Of Huntsville
Infrastructure
Conception
$2,500,000 CJ est. value
Huntsville, AL 35801

Eastern Bypass - City Of Huntsville
Infrastructure
Conception
$10,600,000 CJ est. value
Huntsville, AL 35763

Oak Meadows
New Construction, Infrastructure
Design
Huntsville, AL 35810

Paxton Place Apartments
New Construction, Infrastructure
Design
$125,000,000 CJ est. value
Huntsville, AL 35801

Transit Transfer Station
New Construction, Infrastructure
Post-Bid
$15,677,228 CJ est. value
Huntsville, AL 35801

Kroger U-606 / Madison
Demolition, Infrastructure, Build-out, Renovation - 89,892 SF
Post-Bid
$2,500,000 CJ est. value
Madison, AL 35758

Old Monrovia Site Prep
Infrastructure
Results
$450,000 est. value
Huntsville, AL

Constellation Phase I Row Improvements
Infrastructure
Results
$809,415 CJ est. value
Huntsville, AL 35801

LEO at Flint Crossing
New Construction
Construction
$51,400,000 est. value
Meridianville, AL 35759

Southpointe Homes
New Construction
Construction
$78,000,000 est. value
Huntsville, AL 35803

Carillon Oaks Madison
Demolition, New Construction, Infrastructure - 35,195 SF
Pending Verification
$9,500,000 CJ est. value
Madison, AL 35758

Everstead Residential Development
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Madison, AL 35758

Holmes Avenue Improvements - City Of Huntsville
Infrastructure
Conception
$17,000,000 CJ est. value
Huntsville, AL 35805

St. Clair Place Subdivision / Huntsville
New Construction
Design
$73,565,000 est. value
Huntsville, AL

Boring Support Services
Infrastructure
Post-Bid
$265,000 est. value
Huntsville, AL

Last Updated 05/02/2023 10:35 AM
Project Title

Meadows At Hampton Cove Phase 5

Physical Address View project details and contacts
City, State (County) Owens Cross Roads, AL 35748   (Madison County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 2, 2023, construction is on going for this project.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents