Similar Projects
Clinton Avenue Improvements - City Of Huntsville
Infrastructure
Conception
$2,500,000 CJ est. value
Huntsville, AL 35801

Eastern Bypass - City Of Huntsville
Infrastructure
Conception
$10,600,000 CJ est. value
Huntsville, AL 35763

Oak Meadows
New Construction, Infrastructure
Design
Huntsville, AL 35810

Margaritaville Hotel / Madison
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Madison, AL 35758

Transit Transfer Station
New Construction, Infrastructure
Post-Bid
$15,677,228 CJ est. value
Huntsville, AL 35801

Kroger U-606 / Madison
Demolition, Infrastructure, Build-out, Renovation - 89,892 SF
Post-Bid
$2,500,000 CJ est. value
Madison, AL 35758

Constellation Phase I Row Improvements
Infrastructure
Results
$809,415 CJ est. value
Huntsville, AL 35801

Highway 53 and Jeff Road Improvements
Infrastructure
Results
$1,191,129 CJ est. value
Harvest, AL 35749

Livano Town Madison
New Construction, Infrastructure - 422,545 SF
Construction
$119,000,000 CJ est. value
Madison, AL 35758

Meadows At Hampton Cove Phase 5
New Construction, Infrastructure
Construction
$4,000,000 CJ est. value
Owens Cross Roads, AL 35748

Paxton Place Apartments
New Construction, Infrastructure
Pending Verification
$125,000,000 CJ est. value
Madison, AL 35758

Everstead Residential Development
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Madison, AL 35758

Holmes Avenue Improvements - City Of Huntsville
Infrastructure
Conception
$17,000,000 CJ est. value
Huntsville, AL 35805

Balch Road Widening 15-021 - City of Madison
Infrastructure
Design
$1,681,304 CJ est. value
Madison, AL 35758

Boring Support Services
Infrastructure
Post-Bid
$265,000 est. value
Huntsville, AL

Last Updated 07/25/2023 03:44 PM
Project Title

Carillon Oaks Madison

Physical Address View project details and contacts
City, State (County) Madison, AL 35758   (Madison County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Assisted Living Facility, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $9,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 25, 2023, the construction has begun.

Details

1 Story Above Grade, 35,195 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents