Similar Projects
2021 Pavement Rehabilitation Project
Post-Bid
Huntsville, AL 35810

Signal and Pedestrian Signal Hardware Items and Signal and Pedestrian LEDs and LED Inserts
Term Contract
Post-Bid
Huntsville, AL

Sanderson Road Drainage Improvements, Phase II
Results
Huntsville, AL

Shorter Street Drainage Improvements
Results
Madison, AL 35758

Circle K - Road Improvements and Convenience Store
New Construction, Alteration - 5,533 SF
Construction
Huntsville, AL 35810

Hobbs Island Road Cross Drain Replacement
Infrastructure
Post-Bid
Huntsville, AL 35810

John Hunt Park Pond Liner
Results
Huntsville, AL 35801

Installation of Traffic Signals at Old Railroad Bed Road and Toney Road Intersection
Infrastructure
Post-Bid
Toney, AL 35773

Balch-Gillespie Roundabout Project
Results
Madison, AL

Periodic Bid for Various Construction Projects - 2021
Term Contract
Post-Bid
Huntsville, AL

Constructing the Micro-Milling, Resurfacing, and Traffic Stripe
Results
$14,249,080 to $17,415,543 est. value
Huntsville, AL

Executive Plaza Demolition Erosion Control
Infrastructure
Post-Bid
Huntsville, AL 35899

Asphalt Repairs for the Water Department
Term Contract
Results
$445,775 est. value
Huntsville, AL 35811

Right-of-Way Mowing
Term Contract
Post-Bid
Madison, AL

Jordan Road and Homer Nance Road Roundabout
Results
Huntsville, AL 35811

Reported 05/25/2022 12:00 AM
Project Title

Air Cargo South Access Road Extension

Physical Address View project details and contacts
City, State (County) Huntsville, AL 35824   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Paving/Reconstruction, Shoreline/Erosion/Drainage, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022, Construction Completion Expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will consist of the milling and repaving of the existing Air Cargo Road and the extension of the same road for approximately 1500 ft. to an intersection with Wall Triana Highway. The work will include grading, drainage, paving, striping, signage, revegetating disturbed areas, etc.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents