Similar Projects
Shores at Palmetto Bay
New Construction
Conception
Palmetto Bay, FL

Wynwood Apartments
New Construction
Conception
$10,000,000 CJ est. value
Miami, FL

One Brickell City Centre
New Construction - 743,768 SF
Design
$1,000,000,000 est. value
Miami, FL

3900 Alton
New Construction - 178,000 SF
Design
$10,000,000 CJ est. value
Miami Beach, FL 33140

Aura North Miami Beach
New Construction, Build-Out - 621,613 SF
Sub-Bidding
North Miami Beach, FL 33160

PHCD Work-Order Contract 2021 - South Area
Post-Bid
$2,096,656 est. value
Goulds, Homestead, Miami, Naranja, Princeton, South Miami Heights, FL 33125

Prequalification for the NMCRA Residential Rehabilitation Construction Program
Renovation
Post-Bid
North Miami, FL

CM at Risk Proposals for Little Haiti Condominium Building
New Construction - 19,788 SF
Results
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Work Order Contract 2020- Central Area
Results
Less than $2,500,000 est. value
Miami, FL

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

Markers Grove Isle
New Construction, Renovation - 126,350 SF
Construction
$10,000,000 est. value
Coconut Grove, FL

Stellar Golden Glades
New Construction, Demolition
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

7918 West Drive
New Construction - 99,078 SF
Design
$5,000,000 to $10,000,000 CJ est. value
North Bay Village, FL

Downtown Doral Lennar Residential
New Construction - 62,208 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Doral, FL 33166

VCA/ADA Improvement to Common Areas and Laundry Rooms
Renovation
Results
Hialeah, FL 33010

Reported 01/05/2022 12:48 PM
Project Title

Monad Terrace

Physical Address View project details and contacts
City, State (County) Miami Beach, FL   (Miami-Dade County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method
Project Status Building in Operation as of August 2021
Bids Due View project details and contacts
Estimated Value $65,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

2 Apartments/Condominiums, 7 to 14 Stories Above Grade, 194,396 SF New Construction 59 Unit(s), 1.62 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents