Similar Projects
Last Updated | 08/29/2022 12:24 PM |
Project Title | Wastewater Treatment Plant Chlorination / Dechlorination Improvements |
Physical Address | View project details and contacts |
City, State (County) | Tyler, TX 75703 (Smith County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sewage Treatment Plant, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,661,620 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project No - 21028 Sealed bids will be for furnishing all necessary materials, equipment, superintendence, and labor for construction of the following being improvements for the City of Tyler, Texas: City of Tyler Bid Number: 22-032 Project Name: Wastewater Treatment Plant Chlorination/Dechlorination Improvements The project includes: Replacement of chlorine and sulfur dioxide chemical storage and feed systems, installation of water supply improvements, installation of an emergency gas scrubber, replacement of gates, enclosure of chlorine storage area, replacement of doors, windows, and lighting, paving and site improvements, and associated appurtenances. Work under this contract includes: Removal and replacement of existing chlorine and sulfur dioxide chemical storage and feed systems at the City's Southside Wastewater Treatment Plant. Installation of water supply improvements to chlorine feed room for chlorine solution development and chlorine residual analysis at the City's Southside Wastewater Treatment Plant. Installation of an emergency scrubber at the City's Southside Wastewater Treatment Plant. Removal and replacement of chlorine contact chamber gates at the City's Southside Wastewater Treatment Plant. Enclosure of the existing chlorine storage area at the City's Southside Wastewater Treatment Plant including new concrete masonry block and brick veneer walls. Removal and replacement of existing windows, doors, and lights throughout the chlorination/dechlorination building at the City's Southside Wastewater Treatment Plant. Site improvements at the City's Southside Wastewater Treatment Plant including asphalt driveway, all-weather access rock driveway, concrete sidewalks, concrete pavement, concrete foundation for emergency scrubber, and associated appurtenances. Removal and replacement of existing chlorine and sulfur dioxide chemical storage and feed systems at the City's Westside Wastewater Treatment Plant. Installation of water supply improvements to chlorine feed room for chlorine solution development and chlorine residual analysis at the City's Westside Wastewater Treatment Plant. Removal and replacement of chlorine contact chamber effluent weir at the City's Westside Wastewater Treatment Plant. Site improvements at the City's Westside Wastewater Treatment Plant including asphalt driveway, concrete sidewalks, concrete pavement, drainage improvements, and associated appurtenances. Questions concerning this project shall be submitted 72 hours prior to bid opening through the Q&A Portal Estimate: $2,250,000.00 - $2,750,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Liquidated Damages $1,000.00 Calendar Days: 240 1. Removal and replacement of existing chlorine and sulfur dioxide chemical storage and feed systems at the City's Southside Wastewater Treatment Plant. 2. Installation of water supply improvements to chlorine feed room for chlorine solution development and chlorine residual analysis at the City's Southside Wastewater Treatment Plant. 3. Installation of an emergency scrubber at the City's Southside Wastewater Treatment Plant. 4. Removal and replacement of chlorine contact chamber gates at the City's Southside Wastewater Treatment Plant. 5. Enclosure of the existing chlorine storage area at the City's Southside Wastewater Treatment Plant including new concrete masonry block and brick veneer walls. 6. Removal and replacement of existing windows, doors, and lights throughout the chlorination/dechlorination building at the City's Southside Wastewater Treatment Plant. 7. Site improvements at the City's Southside Wastewater Treatment Plant including asphalt driveway, all-weather access rock driveway, concrete sidewalks, concrete pavement, concrete foundation for emergency scrubber, and associated appurtenances. 8. Removal and replacement of existing chlorine and sulfur dioxide chemical storage and feed systems at the City's Westside Wastewater Treatment Plant. 9. Installation of water supply improvements to chlorine feed room for chlorine solution development and chlorine residual analysis at the City's Westside Wastewater Treatment Plan 10. Removal and replacement of chlorine contact chamber effluent weir at the City's Westside Wastewater Treatment Plant. 11. Site improvements at the City's Westside Wastewater Treatment Plant including asphalt driveway, concrete sidewalks, concrete pavement, drainage improvements, and associated appurtenances. |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |