Similar Projects
US-270B - Grade, Drain and Surface
Infrastructure
Conception
$14,500,000 CJ est. value
Shawnee, OK 74801

US-270B - Grade, Drain and Surface
Infrastructure
Conception
$14,500,000 CJ est. value
Shawnee, OK 74801

US 270 - Grade,Drain,Bridge and Surface
Infrastructure, Renovation
Design
$4,000,000 CJ est. value
Shawnee, OK 74801

US 270 - Grade,Drain,Bridge and Surface
Infrastructure, Renovation
Design
$4,000,000 CJ est. value
Shawnee, OK 74801

Absentee Shawnee Police Safety Center
Infrastructure, Renovation - 5,581 SF
Bidding
$200,000 CJ est. value
Shawnee, OK 74801

Absentee Shawnee Police Safety Center
Infrastructure, Renovation - 5,581 SF
Bidding
$200,000 CJ est. value
Shawnee, OK 74801

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Resurface (Asphalt)
Post-Bid
OK

Resurface (Asphalt)
Results
OK

Slabjacking and Subsealing Services
Infrastructure
Results

Absentee Shawnee Police Safety Center
Infrastructure, Renovation
Bidding
$200,000 CJ est. value
Shawnee, OK 74801

Resurface (Asphalt)
Post-Bid
OK

Resurface (Asphalt) - US-177
Infrastructure
Results
OK

Shawnee City Lake Dam Repairs
Infrastructure
Bidding
$4,000,000 CJ est. value
Shawnee, OK 74801

Kickapoo Street Sidewalk Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Shawnee, OK 74801

Last Updated 08/30/2022 09:11 AM
Project Title

CPN Grand to Blackberry Frontage Road

Physical Address View project details and contacts
City, State (County) Shawnee, OK 74801   (Pottawatomie County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of developing a complete set of PEstamped Plans, Specifications and Estimate (PS&E) to include roadway design and drainage improvements, completing construction staking and geotechnical investigations, and assisting with the environmental review and construction bidding and oversight. Request for Proposals including the project's scope of services and proposal submission guidelines is available to potential bidders by contacting Shawn Howard, CPN Transportation Director, at showard@potawatomi.org.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents