Similar Projects
US-270B - Grade, Drain and Surface
Infrastructure
Conception
$14,500,000 CJ est. value
Shawnee, OK 74801

US-270B - Grade, Drain and Surface
Infrastructure
Conception
$14,500,000 CJ est. value
Shawnee, OK 74801

CPN Grand to Blackberry Frontage Road
Infrastructure
Bidding
$900,000 CJ est. value
Shawnee, OK 74801

CPN Grand to Blackberry Frontage Road
Infrastructure
Bidding
$900,000 CJ est. value
Shawnee, OK 74801

Resurface (Asphalt)
Post-Bid
OK

Resurface (Asphalt)
Post-Bid
OK

Resurface (Asphalt)
Results
OK

Slabjacking and Subsealing Services
Infrastructure
Results

Wanette Water System Improvements
Infrastructure
Bidding
$450,000 CJ est. value
Wanette, OK 74826

Bethel Volunteer Fire Department
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Bethel Acres, OK 74801

Resurface (Asphalt) - US-177
Infrastructure
Results
OK

CPN Citizen Place Phase II New Roads Construction
Infrastructure
Bidding
$73,000,000 CJ est. value
Shawnee, OK 74801

Kickapoo Street Sidewalk Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Shawnee, OK 74801

Wastewater System Improvements
Renovation, Infrastructure
Results
$103,558,730 CJ est. value
Shawnee, OK 74801

Shawnee City Lake Dam Repairs
Infrastructure
Bidding
$4,000,000 CJ est. value
Shawnee, OK 74801

Last Updated 08/09/2022 02:38 AM
Project Title

Absentee Shawnee Police Safety Center

Physical Address View project details and contacts
City, State (County) Shawnee, OK 74801   (Pottawatomie County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the Absentee Shawnee Police Safety Center. The Work Includes a Construction of the 5,940 Square Foot Police Safety Center and the Parking Lot for the Facility. This is a Turnkey Project. All Bid Proposals Must Include All Interior/exterior Changes and Finishes Including but Not Limited to All Concrete; Masonry; Framing; Roofing; Electrical; Plumbing and All Finish Work. Contractor Will Be Responsible for All City Permits and Any Meetings Needed for City and Absentee Shawnee Tribe Approval. The Absentee Shawnee Tribe of Oklahoma Reserves the Right to Reject Any and All Bids.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents