Similar Projects
US-270B - Grade, Drain and Surface
Infrastructure
Conception
$14,500,000 CJ est. value
Shawnee, OK 74801

US-270B - Grade, Drain and Surface
Infrastructure
Conception
$14,500,000 CJ est. value
Shawnee, OK 74801

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

CPN Grand to Blackberry Frontage Road PS and E
Infrastructure
Bidding
$900,000 CJ est. value
Shawnee, OK 74801

CPN Grand to Blackberry Frontage Road PS and E
Infrastructure
Bidding
$900,000 CJ est. value
Shawnee, OK 74801

Resurface (Asphalt)
Post-Bid
OK

Resurface (Asphalt)
Post-Bid
OK

Resurface (Asphalt)
Results
OK

Slabjacking and Subsealing Services
Infrastructure
Results

RFQ - On-Call Services for Water Distribution and Wastewater Collection Design
Term Contract
Bidding
Shawnee, OK 74801

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Resurface (Asphalt) - US-177
Infrastructure
Results
OK

Wastewater System Improvements
Renovation, Infrastructure
Post-Bid
$61,503,195 CJ est. value
Shawnee, OK 74801

Resurface (Asphalt) County Road (Old State Highway 18)
Infrastructure
Results
$1,563,638 est. value
Shawnee, OK 74804

Bethel Volunteer Fire Department
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Bethel Acres, OK 74801

Last Updated 08/04/2022 08:31 PM
Project Title

CPN Citizen Place Phase II New Roads Construction

Physical Address View project details and contacts
City, State (County) Shawnee, OK 74801   (Pottawatomie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $73,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The physical address of the cpn transportation building is 405 transportation drive, shawnee, ok 74801, located approximately one-quarter of a mile east of the intersection of south gordon cooper drive and hardesty road. The project consists of concrete pavement placement of approximately 0.72 roadway miles to include concrete curbs, handicap ramps, retaining wall, paved ditch, and flume outlet and stilling basin. Interested bidders contact Shawn Howard, CPN Transportation Director, showard@potawatomi.org for the Request for Proposals and other pertinent project information.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents