Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Pittsburgh Glass Center
Addition, Demolition, Infrastructure
Design
$2,000,000 CJ est. value
Pittsburgh, PA 15206

Pittsburgh Glass Center
Addition, Demolition, Infrastructure
Design
$2,000,000 CJ est. value
Pittsburgh, PA 15206

Building Additions and Modifications - New Public Works Facilities
Infrastructure
Post-Bid
$200,000 CJ est. value
Swissvale, PA 15218

Building Additions and Modifications - New Public Works Facilities
Infrastructure
Post-Bid
$200,000 CJ est. value
Swissvale, PA 15218

Construct Classroom at Main Station Farm
New Construction, Infrastructure - 6,000 SF
Results
$4,905,999 CJ est. value
Reno, NV 89502

CD 47 Area Wide Street Reconstruction
Infrastructure
Results
$25,000 est. value
Wall, PA

JPMorgan Chase - East Liberty Branch / Pittsburgh
New Construction, Infrastructure - 3,075 SF
Construction
$1,600,000 CJ est. value
Pittsburgh, PA 15206

JPMorgan Chase - East Liberty Branch / Pittsburgh
New Construction, Infrastructure - 3,075 SF
Construction
$1,600,000 CJ est. value
Pittsburgh, PA 15206

The Julian Apartments / Pittsburgh
New Construction, Infrastructure
Pending Verification
$48,000,000 CJ est. value
Pittsburgh, PA 15213

Oakland Crossing Mixed-Use Development / Pittsburgh
New Construction, Infrastructure
Pending Verification
$370,000,000 CJ est. value
Pittsburgh, PA 15219

Skinny Building & Roberts Building Renovation
Demolition, New Construction, Renovation, Infrastructure
Design
$700,000 CJ est. value
Pittsburgh, PA 15222

CD 47 Valley Avenue Culvert
Infrastructure
Post-Bid
$150,000 CJ est. value
Wall, PA 15148

2022 Road Paving Program
Infrastructure
Results
$105,000 est. value
Carnegie, PA

Last Updated 01/04/2024 11:47 AM
Project Title

Rehabilitation of the Roberto Clemente (6th Street) Bridge

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15222   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction complete as of December 2023 , Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $34,400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: site work and paving of a bridge / Tunnel. As of January 4, 2024, construction of this project has been completed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents