Similar Projects
California Intersection Improvements
Infrastructure, Alteration
Conception
$1,480,000 est. value
Saint Lucie West, FL 34986

California Widening - City of Port Saint Lucie
Infrastructure
Conception
$3,700,000 est. value
Port Saint Lucie, FL 34986

500 Stadium Business Center at SLW
New Construction, Infrastructure - 35,056 SF
Design
$7,500,000 CJ est. value
Port Saint Lucie, FL 34986

500 Stadium Business Center at SLW
New Construction, Infrastructure - 35,056 SF
Design
$7,500,000 CJ est. value
Port Saint Lucie, FL 34986

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Construction of the Northport 24" Force Main on Glades Cutoff Road
Infrastructure
Results
$3,622,820 est. value
FL

Bridge Replacement - SR A1A
New Construction, Infrastructure
Results
$91,021,542 est. value
FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Wylder Communities / Port Saint Lucie - Master Plan
New Construction, Infrastructure
Construction
$200,000,000 CJ est. value
Fort Pierce, FL 34981

Speedway #1551 / Port Saint Lucie
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Port St Lucie, FL 34953

Speedway #1551 / Port Saint Lucie
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Port St Lucie, FL 34953

Bayshore & Lakehurst Signalization - City of Port St. Lucie
Infrastructure
Conception
$800,000 CJ est. value
Port Saint Lucie, FL 34983

Greco Lane Multi-Residential Development / Port St Lucie
New Construction, Infrastructure - 64,063 SF
Design
$13,400,000 CJ est. value
Port St Lucie, FL 34953

Design Criteria Package for the Police Training Facility - City of St. Lucie
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Port St Lucie, FL 34953

Last Updated 05/25/2023 10:39 AM
Project Title

Construction of Floresta Drive Improvements Phase II

Physical Address View project details and contacts
City, State (County) Port Saint Lucie, FL 34983   (Saint Lucie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $29,997,174 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The intent of the City is to procure the services of one (1) qualified Contractor related to the construction of the Construction of Floresta Drive Improvements Phase II Project. The contract period is estimated at seven hundred thirty (730) calendar days. This project is funded through proceeds from the voter-approved 1/2 Cent Sales Tax for Infrastructure Improvement Projects. This is a very high-profile project, and the second major project to be completed with sales tax proceeds (Floresta Phase I being the first). As such, the Contractor shall take all means necessary to ensure a successful, timely project. The improvements include both a two-lane section with landscaped median and a two-lane section with a bi-directional turn lane. Both sections include sidewalks, bike lanes, curb and gutter, landscape, irrigation, water and sewer adjustments and pedestrian lighting. This phase also includes a bridge replacement and removal of an existing pedestrian bridge. Construction sequencing shall be timed such that pedestrian access across the Elkcam Waterway is maintained at all times. This project includes seven (7) sets of construction plans. It is the Contractor's responsibility to familiarize themselves with the terms and conditions set forth in this document. Some of the requirements typical of a City of Port St. Lucie contract have been modified, including but not limited to, liquidated damages, lane closures and weather days. Additionally, it is expected that the Contractor will make continual progress on critical items of work from contract day 1. The Contractor will need to coordinate remaining utility pole removals and all other public utility relocations for the duration of the project. No additional cost or time will be added to work around utility poles until they are removed, unless the Contractor shows that they have made sufficient coordination efforts and that no mitigation or resequencing is possible to allow critical path work to proceed. Coordination of all utilities in conflict with construction are the Contractor's responsibility to assure that the schedule is maintained. The Contractor must hold a preconstruction meeting with utility companies, CEI and the City, and must hold progress meetings every two (2) weeks until all utility conflicts have been resolved. The Contractor must have all the required licenses and certifications necessary to perform this work. The approved License for this work includes a State of Florida General Contractor License. It is the Contractor's responsibility to verify with the City's Building Department that they possess the proper licenses and certifications to perform the work prior to submitting a bid.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents