Similar Projects
Z--CHOH 151201 McMahons Mill to Lock 42
Design
$5,000,000 to $10,000,000 est. value
Williamsport, MD 21795

Acid Mine Drainage System Maintenance Service Contract
Post-Bid
Frostburg, MD

Mistletoe Hall Farm Subdivision and Infrastructure Project
Post-Bid
$2,500,000 to $5,000,000 est. value
Easton, MD 21601

Indian Acres Dam Repair
Results
Earleville, MD

Back Road Repair
Results
$500,001 to $1,000,000 est. value
Sharpsburg, MD

Turkey Point Shoreline Management
Pending Verification
Edgewater, MD 21037

Providing Roadside and Drainage Maintenance for the Administration's Maintenance Shops Located in Anne Arundel County
Post-Bid
$1,000,000 to $2,500,000 est. value
MD

Construction Services Dorsey Avenue Drainage Improvements
Results
$502,697 est. value
Annapolis, MD 21401

CHOH 151201 Reconstruct/Stabilize Historic Stone Wall
Post-Bid
$5,000,000 to $10,000,000 est. value
Williamsport, MD

Culvert Replacement - Station Road
Results
Newcomb, MD

Pipes and Structures Replacement Program for Storm Drains
Term Contract
Post-Bid
$2,500,001 to $5,000,000 est. value
Largo, MD 20774

Construction of the Eisenhower Golf Course Stream Restoration
Results
Crownsville, MD

Lagoon Weir Gate Installation
Post-Bid
Poolesville, MD

Brophietown Mine Seal Emergency Repair
Results
Frostburg, MD 21532

Calverton Channel Rehabilitation
Post-Bid
$2,500,001 to $5,000,000 est. value
Glenarden, MD 20774

Last Updated 06/15/2020 11:35 AM
Project Title

Watkins Mill Road-Travis Avenue Stream Restoration

Physical Address View project details and contacts
City, State (County) Gaithersburg, MD   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

BACKGROUND INFORMATION The proposed project includes five phases of stream restoration totaling approximately 2,300 linear feet of stream. Stream restoration work activities will consist of, but are not limited to, excavation and fine grading, furnishing and installing rock and log structures, furnishing and installing landscape seed, plant materials, and stabilization matting, and restoring and stabilizing all disturbed areas. The project will require the implementation of a traffic control plan for construction activities along Watkins Mill Road and Travis Avenue.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents