Similar Projects
Parrish Farms - Master Plan
New Construction - 4,000,000 SF
Conception
$10,000,000 CJ est. value
FL

The Approach at Ponte Vedra Beach
New Construction - 50,800 SF
Conception
Ponte Vedra, FL

Elevation Pointe
New Construction
Design
Saint Augustine, FL

Guana (Boardwalk to Tower) in St. Johns County
Results
Less than $95,000 est. value
Ponte Vedra Beach, FL 32082

Vilano Beach Fishing Pier Floating Dock Replacement
Results
Less than $218,926 est. value
Saint Augustine, FL 32084

Hyatt Place Hotel
New Construction - 175,163 SF
Construction
$24,000,000 est. value
Saint Augustine, FL 32084

Hilton Garden Inn
New Construction - 56,232 SF
Construction
$9,000,000 est. value
Saint Augustine, FL 32084

Fairfield Inn & Suites
New Construction
Conception
Saint Johns, FL 32259

Historic Downtown Parking Facility 2021 Rehabilitation Project
Renovation
Results
Saint Augustine, FL 32084

Comfort Suites
New Construction - 49,858 SF
Construction
$8,100,000 est. value
Saint Augustine, FL

New Parking Garage
New Construction
Conception
Saint Augustine, FL

Two Car Garage Construction
New Construction
Results
Saint Augustine, FL 32084

The Wharf
New Construction - 11,982 SF
Construction
$965,056 est. value
Saint Augustine, FL 32084

Lakeside Park Pier Improvements
Results
Saint Augustine Beach, FL

Hilton Garden Inn
Renovation - 73,045 SF
Construction
$2,100,000 est. value
Ponte Vedra Beach, FL 32082

Last Updated 05/11/2022 08:51 AM
Project Title

Tribute by Marriott

Physical Address View project details and contacts
City, State (County) Saint Augustine, FL 32080   (Saint Johns County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Hotel/Motel, Parking Garage
Contracting Method
Project Status Construction Commenced fourth quarter 2020, Construction Completion Expected November 2022
Bids Due View project details and contacts
Estimated Value $12,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Hotel/Motel, 5 Stories Above Grade, New Construction 58 Unit(s), Parking Garage, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 13 - Special Construction, Swimming Pools.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents