Similar Projects
Omest Warehouse/Storage Building
New Construction - 88,000 SF
Conception
Apopka, FL 32703

Silverleaf Development Master Plan
New Construction
Conception
Winter Garden, FL 34787

CD83 Contractor's Business Park
New Construction - 204,129 SF
Design
$10,000,000 CJ est. value
Orlando, FL 32804

Airport Commerce Center
New Construction - 656,000 SF
Design
$10,000,000 CJ est. value
Orlando, FL 32824

Patch Road Office/Warehouse
New Construction - 45,000 SF
Sub-Bidding
$5,000,000 to $10,000,000 CJ est. value
Orlando, FL 32822

All Aboard Storage
New Construction - 116,991 SF
Post-Bid
Orlando, FL 32835

Western Beltway Park Warehouses
New Construction - 380,568 SF
Post-Bid
$10,000,000 CJ est. value
Apopka, FL 32703

Crews Commerce Center Industrial Park - Phase II
New Construction - 1,290,240 SF
Construction
$27,900,000 est. value
Orlando, FL 32824

U Park Toy Storage
New Construction - 93,300 SF
Construction
Orlando, FL 32807

Millenia Place Mixed-Use Development Master Plan
New Construction
Pending Verification
Orlando, FL

Extra Space Storage
New Construction - 115,691 SF
Design
Winter Garden, FL 34787

MCO3 MOD
Renovation - 40,308 SF
Post-Bid
Orlando, FL 32824

Morningstar Self-Storage
New Construction - 100,000 SF
Construction
$9,196,144 est. value
Maitland, FL 32751

BlueScope Spec Warehouse
New Construction - 246,000 SF
Design
$16,000,000 est. value
Apopka, FL

FedEx at Infinity Park - Building #800
Renovation - 12,123 SF
Post-Bid
Orlando, FL 32837

Last Updated 11/04/2020 12:54 PM
Project Title

South Water Reclamation Facility North Plant Effluent Pump Station Pre-Engineered Electrical Building

Physical Address View project details and contacts
City, State (County) Orlando, FL 32819   (Orange County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes, but is not limited to, construction of a new pre-engineered electrical building at the South Water Reclamation Facility North Plant Effluent Pump Station.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents