Similar Projects
Detention Facilities and Pump Station to Serve the Enclave at the Woodlands
New Construction
Bidding
TX

Wastewater Treatment Plant Lift Station Rehabilitation
Renovation
Bidding
$258,000 est. value
Houston, TX 77086

Existing Lift Station No. 1 Electrical Modification, Generator, and Motor Control Center Replacement
Post-Bid
TX

Golden Acres WWTP Influent Lift Station
Post-Bid
Pasadena, TX 77506

Construction of Bridgeland Irrigation Pump Station No. 5
Results
Less than $1,378,477 est. value
TX

Repair and Service of Submersible Lift Pumps
Results
Less than $477,625 est. value
TX

4-Inch Force Main to Serve Lift Station No.5
Infrastructure
Bidding
$848,000 est. value
Houston, TX

Booster Pump Replacement Project
Post-Bid
Bellaire, TX

Fountain View Regional LS Construction and Abandonment of Westheimer No. 1 LS
Results
$21,957,065 est. value
Houston, TX

Lift Station No. 1 Rehabilitation
New Construction
Bidding
$482,000 est. value
Houston, TX 77040

Inspection, Maintenance, Repair and Related Items of Lift Station
Term Contract
Post-Bid
Less than $220,000 est. value
Houston, TX

Force Main R/R For Lift Stations
Results
Less than $10,229,101 est. value
Houston, TX 77000

Reclaimed Water Pump Station
New Construction
Post-Bid
$1,070,000 est. value
TX

Lift Stations No. 16, 17, 18, and 21 Improvements
Results
Clear Lake City, TX 77058

2020 Transportation Center Number 6 - Detention Basin and Pump Station
New Construction
Post-Bid
Less than $2,000,000 est. value
Cypress, TX 77429

Last Updated 06/23/2021 07:51 AM
Project Title

Brondesbury Lift Station Conversion

Physical Address View project details and contacts
City, State (County) Katy, TX 77450   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $998,900
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Brondesbury Lift Station Conversion including demolition, structural modification, pumps, piping, valves, electrical work and other goods and services.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents