Similar Projects
Groundwater Well Field and Transmission Construction - WIF32 - City of Bozeman
Infrastructure
Conception
$7,500,000 est. value
Bozeman, MT 59715

Water Mains With Fowler Corridor Street Improvements - WIF58 - City of Bozeman
Infrastructure
Conception
$900,000 est. value
Bozeman, MT 59718

Raw Water Intake, Pump Station, and Pipeline
Renovation, Infrastructure
Bidding
$50,000 est. value
Fort Smith, MT

Knight Livestock Pipeline Extension
Infrastructure
Bidding
$25,000 to $250,000 est. value
Wibaux, MT

VRF Piping Replacement
Infrastructure
Post-Bid
Helena, MT 59601

Phase 6 Water System Improvements
Infrastructure
Post-Bid
Roundup, MT

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

Water System Improvements
Infrastructure
Results
Billings, MT 59105

Old Hardin Road Sidewalk: Phase II
Infrastructure
Bidding
$130,000 est. value
Lockwood, MT 59101

Lone Pine State Park Water System Improvements
Infrastructure
Post-Bid
$145,200 est. value
Kalispell, MT 59901

Cooper Street Alley Water Main Replacement Project
Infrastructure
Results
Missoula, MT

Fort Peck Housing Authority 2022 Developments
Infrastructure
Bidding
$300,000 est. value
Poplar, MT

Lead Service Replacements
New Construction, Demolition
Post-Bid
Billings, MT

New Water and Sewer Main, Street Reconstruction
Infrastructure
Results
$619,326 est. value
East Helena, Helena, MT 59601

Spokane Avenue Water Main Replacement Project
Infrastructure
Post-Bid
Whitefish, MT 59937

Reported 07/15/2022 12:31 PM
Project Title

Water Main Cottonwood Road Between Oak To Baxter - Wif52 - City Of Bozeman

Physical Address View project details and contacts
City, State (County) Bozeman, MT 59718   (Gallatin County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

16-inch water main to be constructed in cottonwood Road between oak and baxter to match our street Project in fy 23. That water main is shown in The water master plan, and we need to make sure it Is constructed when the road project is constructed. This project is in included in the City of Bozeman FY 2023-2027 Capital Improvement Plan (CIP). As of July 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents