Similar Projects
Starling Development - Phase 3
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
Kalispell, MT 59901

Starling Development - Phase 3
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
Kalispell, MT 59901

The Charles Hotel
New Construction, Infrastructure - 86,000 SF
Design
$34,000,000 CJ est. value
Kalispell, MT 59901

The Charles Hotel
New Construction, Infrastructure - 86,000 SF
Design
$34,000,000 CJ est. value
Kalispell, MT 59901

Kalispell Water and Sewer Main Replacement - 2023
Infrastructure
Bidding
$3,000,000 CJ est. value
Kalispell, MT 59901

Kalispell Water and Sewer Main Replacement - 2023
Infrastructure
Bidding
$3,000,000 CJ est. value
Kalispell, MT 59901

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

10,000 Gallon Polyethylene and/or Fiberglass Storage Tanks
Infrastructure
Post-Bid
Billings, Bozeman, Butte, Glendive, Kalispell, Lewistown, Miles City, Missoula, Wolf Point, MT 59808

Hudson Bay Divide South
Infrastructure
Results

Existing Surface and Provide a New Plant Mix Surface
Infrastructure
Results
MT

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$6,000,000 CJ est. value
Kalispell, MT 59901

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$6,000,000 CJ est. value
Kalispell, MT 59901

Willow Glen Wash Bay Addition - RB0218-03008 - Flathead County
Addition, Demolition, Renovation, Infrastructure
Conception
$1,026,250 CJ est. value
Kalispell, MT 59901

Creekside Commons
New Construction, Infrastructure
Design
$13,579,200 CJ est. value
Kalispell, MT 59901

Lone Pine State Park Water System Improvements
Infrastructure
Post-Bid
$145,200 est. value
Kalispell, MT 59901

Last Updated 12/09/2022 02:06 PM
Project Title

2021 Water System Improvement Project

Physical Address View project details and contacts
City, State (County) Bigfork, MT 59911   (Flathead County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $4,499,772 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Schedule 1 - Water Transmission Main (Phase 2): Installation of 12" and 16" AWWA C900 PVC water transmission main, 15" SDR 35 PVC drain pipe, valves, fittings, fire hydrants, air vacuum relief valves/vaults, jack and bore across Highway 35, cathodic protection system, concrete storm manholes, grading, asphalt surface restoration, gravel surface restoration, turf reinforcement mat, and site restoration. Schedule 2 - 1 Million Gallon Water Storage Tank: Installation of a 1 million gallon AWWA D110 Type III prestressed concrete tank and appurtenances, excavation for tank site, tank foundation preparation, construction of access road and staging pad, structural backfill, grading, 12" and 16" AWWA C900 PVC water main, valves, fittings, fire hydrants, control valves and vault, tank mixing system, security fence, site electrical, SCADA integration, asphalt surface restoration, and site restoration. Pre-bid inquiries should be directed to Jeff Cicon, P.E., Morrison-Maierle, Inc., 172 Timberwolf Parkway, Kalispell, MT 59901; Telephone 406- 752-2216 or jcicon@m-m.net.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents