Similar Projects
Mt Bighorn Warman Loop Road
Term Contract
Design
MT

Rehabilitate Final 9.3 Miles of the Going-To-The-Sun Road and Replace Bridge Over Mcdonald Creek
Renovation, Term Contract
Design
West Glacier, MT 59936

Bridge Deck Repair and Mill and Fill
New Construction, Infrastructure
Bidding
MT

Grade, Gravel, Plant Mix Surfacing, and Seal and Cover on US-HWY 89
Infrastructure
Bidding
MT

Asrwss Fort Peck West Branchlines Project; Phase 2, Phase 3 And Phase 4
Alteration
Post-Bid
Poplar, MT 59255

Headwaters Trail System Jefferson Street Connection - 2021
Infrastructure
Results
Three Forks, MT 59752

Silver Bow Creek Greenway Cattle Bridge - Greenway Service District
New Construction, Infrastructure, Alteration
Results
Ramsay, MT

Reconstruct Existing Two-Way Stop-Controlled Intersection
Infrastructure
Bidding
Billings, MT 59106

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

Existing Surface and Provide a New Plant Mix Surface
Infrastructure
Bidding
MT

2011-00141 BIA Route #0073 Improvements - Phase III
Infrastructure
Results
MT

Shoulder Widening and Slope Flattening on S-567
Infrastructure
Bidding
MT

Headwaters Trail System Crack Seal and Seal Coat - 2021
Infrastructure
Results
Three Forks, MT 59752

New Water and Sewer Main, Street Reconstruction
Infrastructure
Bidding
East Helena, Helena, MT 59601

Grading, Gravel Surfacing, Plant Mix Surfacing, Bridge Replacement, Guardrail installation, Drainage, Signing and Pavement Markings
New Construction, Infrastructure
Results
MT

Last Updated 10/14/2021 04:49 AM
Project Title

Hudson Bay Divide South

Physical Address View project details and contacts
City, State (County) State-Wide: MT
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Grading, gravel surfacing, plant mix surfacing, bridge replacement, guardrail installation, drainage, signing and pavement markings on the Hudson Bay Divide South in Glacier County. The project begins west of Browning on US 89/State Primary Route 58 at RP 20.7 and proceeds northwest to RP 25.5. The historic bridge crossing at the South Fork Milk River will be replaced. The project is located entirely within the boundaries of the Blackfeet Indian Reservation.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents