Similar Projects
Mt Bighorn Warman Loop Road
Term Contract
Design
MT

Y--GAOA Stellar Creek Road Repair
Term Contract
Design
$500,000 to $1,000,000 est. value
Forsyth, MT 59327

Rehabilitate Final 9.3 Miles of the Going-To-The-Sun Road and Replace Bridge Over Mcdonald Creek
Renovation, Term Contract
Bidding
West Glacier, MT 59936

Chip Seal Fog Seal Tri-Hill Frontage Road Great Falls Area
Infrastructure
Bidding
Great Falls, MT 59404

Pistol Range, Parking & Road Improvements
Alteration
Post-Bid
Billings, MT

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Headwaters Trail System Jefferson Street Connection - 2021
Infrastructure
Results
Three Forks, MT 59752

Silver Bow Creek Greenway Cattle Bridge - Greenway Service District
New Construction, Infrastructure, Alteration
Results
Ramsay, MT

Chip Seal Fog Seal Belt to Highwood Road Great Falls Area
Infrastructure
Bidding
Walkerville, MT 59701

Jct Sec 462 - East and West Nh-Nhpb 57-5(47)230
Infrastructure
Post-Bid
MT

Groundwater Wells
Infrastructure
Results
$277,200 est. value
Helena, MT 59602

Highwood Drive Reconstruction and SID 1411 Park Lane Paving
Infrastructure
Bidding
Billings, MT

East of East Helena - East Nh 8-2(99)53
Infrastructure
Post-Bid

Headwaters Trail System Crack Seal and Seal Coat - 2021
Infrastructure
Results
Three Forks, MT 59752

Skookum Tornilla Pile and Scarify
Term Contract
Bidding
Thompson Falls, MT

Last Updated 12/17/2021 11:43 AM
Project Title

Asrwss Fort Peck West Branchlines Project; Phase 2, Phase 3 And Phase 4

Physical Address View project details and contacts
City, State (County) Poplar, MT 59255   (Roosevelt County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development
Contracting Method General Contractor to Subcontract.
Project Status Results, Construction Start Expected second quarter 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Schedule A, Phase 2: Approximately 142 miles of 2” through 6” diameter PVC pipe, 137 user services, directional drilling, valves, and miscellaneous appurtenant work. Schedule B, Phase 3: Approximately 151 miles of 2” through 8” diameter PVC pipe, 109 user services, directional drilling, valves, and miscellaneous appurtenant work. Schedule C, Phase 4: Approximately 85 miles of 1.5” through 6” diameter PVC pipe, 69 user services, directional drilling, valves, and miscellaneous appurtenant work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents