Similar Projects
Mt Bighorn Warman Loop Road
Term Contract
Design
MT

Jackson Creek Road Improvements
Term Contract
Design

MT Dar 2022(1), Defense Access Roads FY 2022
Term Contract
Bidding
$5,000,000 to $7,000,000 est. value
Great Falls, MT

MT Dar 2022(1), Defense Access Roads FY 2022
Term Contract
Bidding
$5,000,000 to $7,000,000 est. value
Great Falls, MT

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

2011-00141 BIA Route #0073 Improvements - Phase III
Infrastructure
Results
MT

Haskell Coulee - 8 Miles South Glendive
Infrastructure
Bidding
$2,000,000 est. value
Glendive, MT

Cold Milling, Cold Central Plant Recycle or Pulverization, PMS Overlay, Bridge Deck Repairs, Seal
Infrastructure
Post-Bid
MT

Hudson Bay Divide South
Infrastructure
Results

2022 Street Improvement Project
Infrastructure
Bidding
$425,000 est. value
Baker, MT

Scrub Seal Fog Seal East of Brady East Great Falls Area
Infrastructure
Post-Bid
Great Falls, MT

106 US-12 Culvert - East of Baker
Infrastructure
Results
$759,515 est. value

Chip Seal Windham South Lewistown Area
Infrastructure
Post-Bid
Lewistown, MT

Last Updated 05/30/2022 07:55 AM
Project Title

Y--GAOA Stellar Creek Road Repair

Physical Address View project details and contacts
City, State (County) Forsyth, MT 59327   (Rosebud County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction activities to include road grading, culvert & cattle guard removal and replacement, and unclassified excavation located on Stellar Creek Road. Additive alternate schedules for the installation of crushed top surfacing along portions and entire road corridor are also included in this construction requirement. The project work is located along the Stellar Creek Road corridor on BLM lands.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Cattle Guards.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents