Similar Projects
2021 Paving Project
Bidding
Red Hook, NY 12571

Beacon Main Street Accessibility Improvements/ Beacon Pedestrian Signal Improvements
Term Contract
Post-Bid
Beacon, NY 12508

Rehabilitation of County Route 28 (Old Hopewell Road) US Route 9 to County Route 94 (All Angels Hill Road) County Route 28 (Old Hopewell Road) and County Route 94 (All Angels Hill Road) Intersection I
Term Contract
Post-Bid
Poughkeepsie, NY 12603

Chelsea Service Line Connections and Road Repaving
Results
Wappingers Falls, NY

Beekman Road (CR 9) Improvements - PIN 8755.38
Term Contract
Results
Poughkeepsie, NY 12603

Parking Lot Improvements at Dutchess County Stadium
Post-Bid
Wappingers Falls, NY 12590

4.4 Miles of Asphalt Concrete Milling and Resurfacing on Route 44
Results
Less than $13,000,000 est. value
Pleasant Valley, Poughkeepsie, NY 12601

Hudson Hall Walkway Replacement
Term Contract
Post-Bid
Poughkeepsie, NY 12601

Resurfacing on I-84
Results
Less than $11,100,000 est. value

Street Paving Milling and Hauling
Post-Bid
Poughkeepsie, NY 12602

Transportation Alternative Program (TAP) Pedestrian Safety Improvements Route 9D, West Main Street
Results
$400,000 to $500,000 est. value
Wappingers Falls, NY 12590

Scattered Sidewalk, Program Repair and Restoration
Post-Bid
Poughkeepsie, NY 12602

Highway Job Order Contract
Results

Asphalt Paving/Stations 1 and 2 UVFD
Post-Bid
Lagrangeville, Verbank, NY

Accessibility Improvements to the Town Hall
Results
Poughquag, NY 12570

Last Updated 04/23/2021 08:26 AM
Project Title

Special Surface Treatment and Sidewalks

Physical Address View project details and contacts
City, State (County) East Fishkill, Lagrange, Poughkeepsie, NY   (Dutchess County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will maintain traffic safety by resurfacing segments of federal aid eligible State highways. The locations were selected either through the Skid Accident Reduction Program (SKARP), where pavement has reduced skid resistance in wet weather conditions, or at intersections where the pavement has been observed to be uneven due to the rutting and shoving caused by vehicles braking to a stop. The objective of this project is to decrease pavement conditions that may contribute to motorist lane departures in avoidance of uneven pavement surfaces and/or wet weather skidding and the potential for crashes that those conditions could contribute to. This work will take place on select state highways in the Towns of East Fishkill, Lagrange and Poughkeepsie in Dutchess County.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents