Similar Projects
Reported | 04/14/2021 12:00 AM |
Project Title | Hammer Pipeline Design |
Physical Address | View project details and contacts |
City, State (County) | Thornton, CO (Adams County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Design, Bid Assistance and Construction Management (CM) services for a 3.0 mile raw water conveyance pipeline from Hammer Reservoir to Thornton Water Project (TWP) Pipeline at Quebec Street and E470. The pipeline shall be designed to convey between 5MGD and 10MGD of raw water from an existing reservoir and pumped via new highpressure pump station. The new high-pressure pump station is not part of this agreement and it will be designed and constructed concurrently by others. To be minimally qualified for consideration for award, proposing firms must have successfully completed two (2) projects in the Colorado front range corridor that have a similar degree of complexity and cost within the past five (5) years. Proposing firms must have a minimum of two (2) staff member(s) with a Professional Engineer designation that will be assigned to the Project. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |