Similar Projects
OCA CON ERFO Road Construction FL
Alteration
Design
$1,000,000 to $5,000,000 est. value
Silver Springs, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

SE 47th Avenue Resurfacing (from CR 42 to CR 484)
Infrastructure
Post-Bid
$1,042,000 est. value
Ocala, FL 34471

2020 Silver Springs Shores Resurfacing Project
Results
Less than $1,050,000 est. value
FL

2020 Rainbow Park Units 1 and 2 Roadway Improvement Project
Results
Less than $280,000 est. value
FL

Rainbow Park Units 1 and 2 Road Grading FY 20/21
Term Contract
Results
Less than $75,000 est. value
Ocala, FL 34471

NW 165th Court Road Roadway Improvement Project
Results
Less than $275,000 est. value
Ocala, FL 34471

Leonardo Estates NE 52nd Roadway Improvement Project
Results
Less than $110,000 est. value
Ocala, FL 34471

2020 Lake Tropicana Road Improvement Project
Results
Less than $150,000 est. value
Ocala, FL 34471

Resurfacing/Drainage Improvements
Results
Less than $18,229,319 est. value
FL

19/20 Road Overlay Projects - Phase II
Results
Less than $1,126,400 est. value
FL

Emergency Roadside Assistance Services (I-75)
Results

CR 314 Resurfacing (SR 40 to NE 52nd Place Road)
Results
Less than $1,584,000 est. value
Ocala, FL 34471

Design Build Push Button Contract No. 2 - Program Management
Results

NFSR 09-20.5 Road Construction
Results
$25,000 to $100,000 est. value
Silver Springs, FL 34488

Last Updated 09/24/2021 10:40 AM
Project Title

Rainbow Parks Units 1 and 2 Road Grading 2021

Physical Address View project details and contacts
City, State (County) Dunnellon, FL   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $60,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Grading services for unpaved Marion County maintained roadways. The work involves road grading 4 times per year. Includes grading and compacting the roadway. Limerock material to be added where needed as directed by the MSTU Coordinator (Approximately 500 tons annually). Work is expected to be performed year round, and it is the Contractor’s responsibility to consider seasonal weather conditions (dry and wet periods) in the proposal. All roads are located within the boundaries of Rainbow Park Units 1 & 2 only. As funding becomes available, additional work may be added, at the contracted unit price. Any additional work requested by the MSTU, to be performed outside of the cycle, will be considered an additional cycle and should be invoiced at the contracted unit price.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents