Similar Projects
Rosewood Estates
New Construction - 25,600 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Falmouth, MA 02536

Pike Estates
New Construction
Conception
Attleboro, MA 02703

Greystone Village Subdivision
New Construction
Design
Kingston, MA 02364

Massapoag Street Homes
New Construction
Design
Weymouth, MA 02190

Long-Term Lease and Redevelopment of 555-559 Columbia Road
New Construction - 18,800 SF
Bidding
Boston, MA 02125

Freedom Trust Rivet Street Rehabilitation - General Bid
Renovation
Bidding
$500,000 est. value
New Bedford, MA 02742

CDBG Housing Rehabilitation Services
Renovation
Post-Bid
Chelsea, MA

Rehabilitation of Single Family Homes
Renovation
Post-Bid
Lowell, MA 01854

Kitchen Renovation at 17 Simmons Drive Development 167-1
Renovation
Results
Less than $42,000 est. value
Newburyport, MA 01950

Winterization Upgrades to the Mai Fane House
Renovation
Results
Edgartown, MA 02539

Timber Crest Estates
New Construction
Construction
$61,448,981 est. value
Medway, MA 02053

Franklin Street Duplexes
New Construction - 30,600 SF
Construction
$3,274,200 est. value
Worcester, MA 01608

Lakeland Hills Townhouse Community
New Construction
Pending Verification
Norfolk, MA

Brian's Way
New Construction
Pending Verification
Taunton, MA 02780

Residences at Pine Street
New Construction
Conception
Norfolk, MA 02056

Reported 06/02/2022 12:00 AM
Project Title

Contractor - GC Prequalification - Conversion at Street Botolph

Physical Address View project details and contacts
City, State (County) Boston, MA 02116   (Suffolk County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $28,500,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Conversion of existing building is an 8-story steel/concrete framed structure with concrete and masonry exteriors consisting of 132 residential units and community spaces for the elderly/ disabled population. The building will be occupied during construction. New work includes miscellaneous site revisions, exterior repairs and replacements, renovations to common areas and individual units and upgrades to fire protection, HVAC and MEP systems.

Details

8 Stories Above Grade.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents