Similar Projects
Funkhouser Building Improvements
Renovation
Conception
$110,000,000 est. value
Lexington, KY 40508

Construct Research Building - University of Kentucky
New Construction
Conception
$265,000,000 est. value
Lexington, KY

College of Design
Renovation - 1,445,000 SF
Design
$38,600,000 est. value
Lexington, KY 40508

New College of Medicine
New Construction - 380,000 SF
Design
$380,000,000 est. value
Lexington, KY 40506

Gatton Business & Economics Renovation - Room# 371
Renovation
Bidding
$150,000 CJ est. value
Lexington, KY 40506

Greek Housing Delta Gamma BP-02
Renovation
Post-Bid
Lexington, KY 40508

Pavilion A - 5Th Floor Patient Room Fit-Out - BP-04 - Final Cleaning
Build-Out, Alteration
Post-Bid
Lexington, KY

CEB 151 Elevated Control Room
Renovation
Results
$40,000 to $50,000 est. value
Lexington, KY 40503

Research Building #2 Phase 4 Design Release 1 - Fit-Out
New Construction, Build-Out - 40,400 SF
Results
$15,517,519 est. value
Lexington, KY

Renovate/Improve Nursing Units University of Kentucky Hospital - University of Kentucky
Renovation
Conception
$7,000,000 est. value
Lexington, KY 40506

Gluck Equine Building Lab 448 and 450 Renovation
Renovation
Design
$295,000 CJ est. value
Lexington, KY 40503

Research Building #2 Phase 4 - Final Clean
Alteration
Post-Bid
Lexington, KY

CM Services for Delta Gamma Housing - 2555.0
Renovation, Addition
Results
$6,000,000 est. value
Lexington, KY 40508

Improve University of Kentucky Hospital Facilities University Kentucky Chandler Hospital - University of Kentucky
Renovation
Conception
Lexington, KY 40506

Maintenance, Repair and Operations (MRO) Trade Services
Renovation, Alteration
Post-Bid
Lexington, KY

Last Updated 10/03/2022 04:34 PM
Project Title

Peterson Building - 1st Floor Restroom Renovations Rooms #106 and 107

Physical Address View project details and contacts
City, State (County) Lexington, KY 40508   (Fayette County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Bids will be received from Prime Contractors on a Lump Sum Amount for the total project. All phases of the work shall be bid to and through the Prime Contractors. Bids shall be submitted in the manner herein described and on the official proposal form included with the conditions and specifications and shall be subject to all the conditions as set forth and described in the Bid Documents. Bids shall be submitted only on the Official Forms supplied by the University of Kentucky, Construction Procurement Section. Failure to comply with the foregoing requirements will be cause for invalidation of bid. Final award of Contract will be made on the basis of the lowest, responsive and responsible bid which offers the best value. The time for substantial completion for all phases shall be Forty-Five (45) consecutive calendar days and Final Completion shall be Thirty (30) consecutive calendar days thereafter. Substantial Completion will include all site restoration completed, site clean-up and fully functional. All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid. A 100% Performance Bond and 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instruction to Bidders, General Conditions and Special Conditions. Payments for Plans, Specifications and Official Bid Documents must be made to Lynn Imaging before a set of documents will be issued. Notes: Contractors that receive plans and specifications from other sources than Lynn Imaging must request a "Form of Proposal" from the University's Purchasing Representative to be registered as plan holders and to receive addendums. Potential Contractors must identify the position of their firm as a prime bidder, miscellaneous subcontractor, material supplier or other when ordering of picking up Plans and Specifications. Bids, upon their receipt by the University of Kentucky, Construction Procurement Section are stamped showing the hour and date received. Bids received after the scheduled closing time for reception of bids will not be considered provided legal and accepted bids have been received on said referenced Invitation. No bidder may withdraw his bid for a period of sixty (60) days after the date set for the opening of bids. Clerical errors and omissions in the computation of the lump sum shall not be cause for withdrawal of the bid without forfeiture of bid bond. Bids may be withdrawn in person only, prior to the closing date for receipt of bids. Anyone wishing to discuss specific items is requested to submit the items in writing to Capital Construction Procurement, no later than 09/21/2022 at 1:00 PM Lexington, KY Time. Written questions can be submitted by email to Ken Scott at cckbidquestions@uky.edu or fax to 859.257.1951. Bidders wishing to submit a request for consideration of an alternate under the provisions of Article 48.3 of the General Conditions to the Contract to any article, device, equipment, product, material, fixture, patented process, form, method or type of construction, or by name, make, trade name, or catalog number shall submit a written request to the University at least 14 calendar days prior to the official bid date of the Project including all necessary information and sufficient detail to allow evaluation by the Consultant and the University and, if the University determines the alternate is acceptable, an addendum will be issued allowing the change and advising all bidders of the option. If no addendum is issued to allow the requested change, the Bidder shall assume the request is not approved and shall prepare the bid on that basis. University of Kentucky Strategic Vision: As Kentucky's indispensable institution, we transform lives through diversity and inclusion, discovery, research and creativity, promotion of health and deep community engagement. Mission: The University plays a critical leadership role by promoting diversity, inclusion, economic development, and human well-being. As the flagship institution in Kentucky, UK plays a critical leadership role for the Commonwealth by contributing to the economic development and quality of life within Kentucky's borders and beyond. The University nurtures a diverse community characterized by fairness and equal opportunity. We will diligently seek and work with companies that share our vision, mission, and values. Supplier Diversity Goals: We are committed to increasing the purchasing of goods and services from minority, women, veteran, and disabled-owned businesses to a minimum of ten percent with an aspirational goal that equals and surpasses the diversity on our campus and in the communities we serve. In addition, UK supports non-profit work centers for the blind and disabled. All contractors are expected to reach these goals. Bidders utilizing minority, women, veteran, and disabled-owned businesses are requested to identify these contractors and suppliers in the space provided on the Form of Proposal. The successful contractor will be asked to supply associated contract amounts rounded to the nearest $500.00 prior to the signing of a contract. For assistance in identifying diverse businesses and contractors please contact Marilyn Clark, Supplier Diversity Manager, University of Kentucky at mcl256@uky.edu The University of Kentucky, Construction Procurement Section, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served PROJECT DESCRIPTION THIS PROJECT IS THE CONSOLIDATION OF TWO (2) WOMEN'S RESTROOMS INT ONE (1) WOMEN'S RESTROOM WITH ADA COMPLIANCE

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents