Similar Projects
Waterset By Newland
New Construction
Conception
Apollo Beach, FL 33572

New City Hall Complex
New Construction
Conception
Less than $5,700,000 est. value
Lake City, FL 32055

Nolte Road Commercial Park
New Construction
Design
Saint Cloud, FL 34772

Oviedo on the Park - Lot 4 - Sitework
New Construction
Design
Oviedo, FL 32765

Construction of Public Works Operations Facility
New Construction - 32,000 SF
Bidding
$11,000,000 est. value
Clermont, FL 34711

Nassau County Justice Center Courtroom 3 - Preparation of Design Criteria Package
New Construction
Bidding
Yulee, FL 32097

Miami Dade College Dyer Courthouse Renovation
Renovation
Post-Bid
Miami, FL 33132

Cordova Palms - Site Only
New Construction
Post-Bid
Saint Augustine, FL

Design Build for the Seminole County Justice Center and Public Safety Administration Building
Results
Less than $65,625,000 est. value
Sanford, FL

Unsolicited Proposal for the Development, Operation and Maintenance of a Soccer Complex and Other Facilities
Results
Miramar, FL

Waller Park Renovations ADA Improvements Capitol Building
Renovation
Construction
Tallahassee, FL 32301

New City Hall and Municipal Campus Improvements
- 120,000 SF
Construction
Sunrise, FL

Pace Commons
New Construction
Pending Verification
Pace, FL

The Crossroads Mixed-Use Community
New Construction - 340,000 SF
Pending Verification
$10,000,000 CJ est. value
Saint Johns, FL 32259

Courthouse Expansion
Addition
Conception
$15,000,000 est. value
Panama City, FL

Last Updated 10/18/2021 08:33 AM
Project Title

Village Hall and Site Construction

Physical Address View project details and contacts
City, State (County) Royal Palm Beach, FL   (Palm Beach County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $12,894,392
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a 25,380± SF Village Hall to include parking lot, lighting, and security cameras; constructing the new facades for the Palm Beach Sheriffs Office, Meeting Hall and David Farber Training Buildings; and demolition of the existing Village Hall building.

Details

1 Capitol/Court House/City Hall, 2 Stories Above Grade, Approximately 25,400 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents