Similar Projects
Texas A&M Corpus Christi Parking Garage
New Construction
Conception
Corpus Christi, TX 78412

Parking Garage Construction
New Construction
Conception
$31,000,000 est. value
Stephenville, TX

Royal Caribbean Cruise Terminal
New Construction - 170,000 SF
Design
Galveston, TX 77550

Office Building & Parking Garage
New Construction - 240,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX 75254

SHSU Coliseum Parking Garage
Post-Bid
Huntsville, TX 77341

Epic Central Phase II
Post-Bid
Grand Prairie, TX

Pressler Street Garage 2 - Design Build
Results
$21,500,000 est. value
Houston, TX 77030

Design-Build Services for New Parking Structure (Avenue I)
Results
Huntsville, TX 77340

Stacy Green
New Construction
Construction
Allen, TX 75013

St. Anne Catholic Community
New Construction - 151,400 SF
Construction
$19,000,000 est. value
Houston, TX 77098

4411 San Felipe Mixed Use
New Construction
Pending Verification
Houston, TX 77027

TCC Legacy West Spec
New Construction - 420,000 SF
Pending Verification
$85,000,000 est. value
Plano, TX 75024

Deep Ellum Office Development
New Construction - 435,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX 75226

VISD Pine Forest Elementary and Transportation Center Parking Improvement Project
Post-Bid
Vidor, TX 77662

Trinity Mills Station Phase I
New Construction - 125,000 SF
Results
$10,000,000 CJ est. value
Carrollton, TX 75006

Last Updated 10/26/2021 10:55 AM
Project Title

CMR for DM at Capitol Complex Garages

Physical Address View project details and contacts
City, State (County) Austin, TX 78711   (Hays County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,455,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

TFC owns and maintains 8 parking structures in the Capitol Complex area of downtown Austin; see Attachment H.1 for location and size of these garages. Corrections to deficiencies of the Structural, Building Envelope, Waterproofing, Life Safety, Fire Protection, Mechanical and Electrical Systems, Sitework and other incidental scopes of work made necessary by the execution of these repairs, constitute the Project’s scope of work.

Details

Parking Garage, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents