Similar Projects
Last Updated | 08/07/2023 10:13 PM |
Project Title | RFQ D/B - US 101/SR 116 North Olympic Peninsula - Remove Fish Barriers |
Physical Address | View project details and contacts |
City, State (County) | Port Angeles, WA 98363 (Clallam County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Request for Qualifications, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $102,364,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project will remove existing barriers to fish migration at the following US 101 & SR 116 stream crossings and replace with fish-passable structures in compliance with the federal injunction regarding fish passage underneath WSDOT highways Tumwater Creek (US 101 MP 246.4), Ennis Creek (US 101 MP 250.0), Lees Creek (US 101 MP 250.5) and Chimacum Creek (SR 116 MP 0.22). The Project will include providing water crossing and structure designs, plans, and specifications for the project, design documentation, hydraulic design documentation, stream restoration in the immediate vicinity of the crossings, as required and mitigation solutions for sensitive area impacts. Acquiring environmental permits as an authorized agent of WSDOT and facilitating temporary and permanent utility adjustment and relocation. Other elements include, but are not limited to, constructing embankments, structural shoring, creek channel grading & large woody material structures, paving and pavement marking, traffic control, stormwater catchment & treatment, guardrail, sidewalks & ADA, signing, signals & illumination, erosion control, and planting. A state and federally funded contract. DBE goals are to be determined. County Clallam County Jefferson County Estimated value $85,000,000.00 - $105,000,000.00 WADOT - RFQ D/B - US 101/SR 116 North Olympic Peninsula - Remove Fish Barriers *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Deadline for Submitting Proposer's Questions 5/24/2023 |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |