Similar Projects
Last Updated | 10/01/2023 05:01 PM |
Project Title | RFQ- Construction Management At Risk Phoenix Deer Valley Airport Reconstruct Taxiway C Connectors C4-C10 CMAR Services |
Physical Address | View project details and contacts |
City, State (County) | Phoenix, AZ 85027 (Maricopa County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Runways/Taxiways, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected May 2024 |
Bids Due | View project details and contacts |
Estimated Value | $7,486,500 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The City of Phoenix reserves the right to reject any or all Statements of Qualifications, to waive any informality or irregularity in any Statement of Qualifications received, and to be the sole judge of the merits of the respective Statements of Qualifications received. List the Arizona contractor licenses held by the firm and the key personnel who will be assigned to this project. Provide the contractor license number. Reference the appropriate licenses held, if needed. In order to be considered for this project, the contractor must hold the correct license as deemed appropriate by the Arizona Registrar of Contractors prior to submitting a Statement of Qualifications (SOQ) for this project in accordance with Arizona Revised Statute §32-1151. The Construction Manager at Risk will begin with the firm in an agency support role for preconstruction services. The CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract. The CMAR will be responsible for construction means and methods and will be required to solicit bids from prequalified subcontractors to perform the work using the City’s subcontractor selection process. For this project the CMAR is responsible for self-performing a minimum of 45% of the construction work as measured by total contract price for construction. The GMP must be submitted in MAG or CSI format or it will not be accepted. The project consists of reconstructing and reconfiguring connectors between Taxiway C and Runway 7R-25L to conform with current Federal Aviation Administration guidelines and eliminate non-standard intersections at Phoenix Deer Valley Airport. Connector C5, C6, C7, C8, and C10 will be demolished and reconstructed with a new configuration. Existing connectors between Taxiway C and Runway 7R-25L will be upgraded to address operational needs and hold bar locations between the runway and taxiway. Connectors C4, C7, and C10 will be perpendicular. Connectors C5, C6, and C9 will be acute angle connectors. Connector C9 will also have modified filets and be renamed C8. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |