Similar Projects
Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Craney Island Dredged Material Management Area (CIDMMA) Spillway #1 Replacement
Results
$5,000,000 to $10,000,000 est. value
Portsmouth, VA

160'X 66" Round Steel Liner and Precast Concrete Headwall Appomattox Residency
Results
Shipman, VA 22971

Dry Run Bank Stabilization Project
Infrastructure
Post-Bid
Covington, VA

EW-6 Headwalls
Results

Beaton and Sykes Level 1 Wet Pond
Infrastructure
Post-Bid
Portsmouth, VA

Polymer Coated Corrugated Metal Pipe - Willis and Check Areas
Results
Check, Willis, VA 24380

Wrightsville Community Revitalization - Infrastucture
Infrastructure
Post-Bid
VA

Polypropylene (PP) Triple-Walled Pipe
Term Contract
Results
Amherst, Appomattox, Gladys, Lynchburg, Madison Heights, Roseland, Rustburg, Shipman, VA 24522

Precast Box Culvert Wise Residency
Infrastructure
Post-Bid
Bristol, Norton, VA

Corrugated Metal Pipe and Bands
Infrastructure
Results
Bristol, Norton, VA 24202

Pre-Qualification for Saint Clair Brooks Park Stream Restoration
Infrastructure
Post-Bid
Falmouth, VA 22405

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Little League Fields Project
Infrastructure
Post-Bid
Tazewell, VA 24651

Last Updated 05/17/2022 09:16 AM
Project Title

Construction of Educational Pond Rehabilitation at Virginia Aquarium

Physical Address View project details and contacts
City, State (County) Virginia Beach, VA   (Norfolk City County)
Category(s) Animal/Plant/Fish Facility, Heavy and Highway
Sub-Category(s) Animal/Plant/Fish Facility, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $390,300
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of an existing pond at the Virginia Aquarium and timber walkway from the existing walkway to the pond. An existing pond will be dredged and regraded with the pond liner. The pond profile consists of aquatic shelf along the periphery of the pond and the floating wetlands in the middle of the pond. The submersible circulation pump is provided for pond water circulation. The timber walkway consists of timber piles, timber stringers, composite deck and fencing.

Details

Animal/Plant/Fish Facility, New Construction.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents