Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

South Loop Project
Infrastructure
Bidding
Santa Clara, CA 95134

Various Locations Pavement Renovation No. 54 and Sewer Replacement
Infrastructure
Bidding
$12,500,000 est. value
San Francisco, CA

Highway Safety Improvement Program HSIP 8 Oakland Hills
Infrastructure
Post-Bid
Oakland, CA

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

East Blithedale Rehabilitation Project - Phase I
Alteration
Results
$3,000,000 est. value
Mill Valley, CA

Downtown Rehabilitation Project - Phase II
Alteration
Results
$600,000 to $800,000 est. value
Mill Valley, CA

Province at San Gabriel Condominiums
New Construction, Build-Out, Infrastructure
Design
$20,000,000 est. value
San Gabriel, CA 91776

Place Hma and Perforated Plastic Pipe Underdrain
Infrastructure
Bidding
$16,200,000 est. value
CA

Construction Pine Flat Road Repair Project
Infrastructure
Post-Bid
CA

County of Placer - 2021 Roadway Surface Treatments
Alteration
Results
CA

Roadway Excavation, JPCP and Furnish Polyester Concrete Overlay
Infrastructure
Bidding
$22,300,000 est. value
CA

Paving Repairs and Ramps at FHFB
Term Contract
Post-Bid
Richmond, CA

SB1 Road Maintenance Projects at Various Locations, FY 2020-2021
Infrastructure
Results
Hollister, CA

Last Updated 09/17/2021 12:06 PM
Project Title

Country Club/Monterey et al, Grind, ARAM, Overlay, and Slurry Seal Project

Physical Address View project details and contacts
City, State (County) La Verne, CA 91750   (Los Angeles County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $890,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of furnishing of all necessary materials, labor, tools and equipment for the construction of roadway improvements consisting of cold milling, asphalt pavement overlay, areas of full depth removal and replacement, Asphalt Rubber Aggregate Membrane (ARAM), slurry seal, and pavement markings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents