Similar Projects
Jamestown 12th Avenue Grade, Aggregate Base and Hot Bituminous
Infrastructure
Conception
$1,400,000 est. value
Jamestown, ND 58402

New State Hospital Facility - North Dakota State Hospital
New Construction, Infrastructure
Conception
$160,000,000 CJ est. value
Jamestown, ND 58401

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Construction Management at Risk - Renovations and Remodeling at Medina Public School and/or New Construction for Medina Public School
Addition, Demolition, New Construction, Build-out, Renovation, Infrastructure
Post-Bid
$300,000 CJ est. value
Medina, ND 58467

Chip Seal
Infrastructure
Results
$500,000 est. value
ND

Seal Coat, Patching, Construction, and Reconstruction District
Infrastructure
Results
Jamestown, ND

Pipestem Dam Spillway Modifications
Renovation, Infrastructure
Construction
$131,496,937 CJ est. value
Jamestown, ND 58401

New Anne Carlsen Center / Jamestown
New Construction, Infrastructure - 110,000 SF
Construction
$41,000,000 CJ est. value
Jamestown, ND 58401

Water Main Replacement - City of Jamestown
Infrastructure
Pending Verification
$2,000,000 CJ est. value
Jamestown, ND 58401

Water Main Replacement - City of Jamestown
Infrastructure
Pending Verification
$2,000,000 CJ est. value
Jamestown, ND 58401

Pelican Point Campground Expansions - Park - 25 - 04 - Stutsman County
Infrastructure
Conception
$450,000 CJ est. value
Jamestown, ND 58401

Bismarck Jamestown No.2 230kV Transmission Line Stink Lake Reroute
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Medina, ND 58467

CMC 4717, 5 Miles South of Cleveland and CMC 4717, 1.25 Miles North of Gackle - Grade Raise, Hot Bituminous Pavement, Aggregate Base, Riprap, and Incidentals
Infrastructure
Results
$2,000,001 to $2,500,000 est. value
ND

NextEra Energy Resources Stutsman Wind Farm
New Construction, Infrastructure
Pending Verification
$400,000,000 CJ est. value
Jamestown, ND 58401

RFQ Construction Management At Risk Services - Buchanan Elementary School Addition and Remodel
Addition, Demolition, Build-out, Infrastructure - 9,400 SF
Post-Bid
$4,600,000 CJ est. value
Buchanan, ND 58420

Last Updated 07/07/2023 11:07 AM
Project Title

2023 Water Main Improvements - Rebid

Physical Address View project details and contacts
City, State (County) Jamestown, ND 58401   (Stutsman County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,992,730 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Digital copies of the Bidding Documents are available online for a fee of $37.00. The project will consist of the following approximate quantities: 5700 LF Water Main installation, Asphalt and Concrete Pavement Removal & Replacement, Horizontal Drilling, gate valves, fire hydrants, and all miscellaneous work necessary therefore and incidental thereto. Bidders are required to comply with Davis-Bacon prevailing wage requirements. The goal for MBE is 2% of the total dollar value of the project. The goal for WBE is 3% of the total dollar value of the project. To demonstrate a good faith effort to comply, bidders must include the MBE/WBE subcontractor solicitation form in the bid package. Each bid will be submitted on the basis of a cash payment for work. It will be enclosed in a sealed envelope addressed to the above mentioned City Administrator, 102 Third Avenue Southeast, Jamestown, North Dakota 58401, and shall be designated that the bid is for "2023 Water Main Improvements - Rebid." The bid shall be accompanied by a Bidder's Bond in a separate envelope in the amount of five percent (5%) of the full amount of the bid, executed by the Bidder as Principal and by a Surety Company authorized to do business in North Dakota. If the Principal's bid is accepted by the OWNER and the contract awarded, the principal, within ten (10) days after the Notice of Award, will be required to execute and effect a contract in accordance with the terms of the principal's bid and any requirements and conditions of the OWNER. The work on the improvements is to commence upon a date to be specified by the OWNER, notice of which will be given to the successful bidder ten (10) days in advance of the start of construction. The Contractor will be required to commence construction, and in an approved sequence, complete the project by October 19, 2024. The OWNER retains the right to reject any or all of the bids submitted and to waive any informality in any bid and to hold all bids for a period not to exceed thirty (30) days from said date of opening and to hold the three low bids and bid securities for a period not to exceed sixty (60) days from said date of bid opening.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents