Similar Projects
The Jade Boynton - Master Plan
New Construction
Conception
Boynton Beach, FL 33473

Midtown Place at Boca Raton
New Construction - 120,000 SF
Conception
$10,000,000 CJ est. value
Boca Raton, FL 33486

Congress Business Park Warehouse
New Construction, Build-Out - 44,500 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Lake Park, FL 33403

The Commons at Abacoa III - Post Acute Medical
New Construction - 48,941 SF
Design
$25,000,000 est. value
Jupiter, FL 33458

Lotis - Retail/Office
New Construction - 41,600 SF
Bidding
$5,000,000 to $10,000,000 CJ est. value
Wellington, FL 33414

Construction Management Services - Medical Simulation Laboratory Lake Worth Campus
Renovation
Bidding
Lake Worth, FL 33461

Lee Square
New Construction - 1,217,016 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Lake Worth, FL 33463

Sundy Village - Buildings 1, 2, 3, 8, 9, Garage
New Construction
Post-Bid
Delray Beach, FL 33444

Y1AZ--Renovate Building Number 10 Veterans Benefits Administration Office Space, West Palm Beach, FL.
Renovation - 1,900 SF
Results
$500,000 to $1,000,000 est. value
Riviera Beach, FL 33410

115 N. Federal Highway Infill Mixed-Use Redevelopment Project
New Construction
Results
Boynton Beach, FL 33435

Florida Power and Light Corporate Office
New Construction, Build-Out - 225,000 SF
Construction
$97,324,539 est. value
Palm Beach Gardens, FL 33410

Love Street Development
New Construction, Build-Out - 27,950 SF
Construction
$30,000,000 est. value
Jupiter, FL 33477

One Flagler
New Construction, Build-Out - 524,831 SF
Pending Verification
$88,000,000 est. value
West Palm Beach, FL 33401

Florida Power & Light - Port West Physical Distribution Center
New Construction, Addition, Demolition - 3,060 SF
Pending Verification
Riviera Beach, FL 33407

District Pointe
Renovation - 65,760 SF
Conception
West Palm Beach, FL 33406

Reported 04/14/2022 02:07 PM
Project Title

Western Region Wastewater Treatment Facility Operations Building

Physical Address View project details and contacts
City, State (County) Belle Glade, FL 33430   (Palm Beach County)
Category(s) Commercial, Laboratory, Sewer and Water
Sub-Category(s) Laboratory, Office, Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results, Project to Rebid
Bids Due View project details and contacts
Estimated Value $4,124,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. A new two-story building with the upper level complete with: control room, offices, laboratory, rest/locker rooms and electrical room housing 480 volt switchgear and motor control centers and the lower (ground level) being used for unconditioned storage or alike. 2. Demolition of the existing Operations Building and associated disused clearwell located under the existing Operations Building. 3. Relocation of process and non-process related piping. 4. A new secure entry way and parking lot for the new Operations Building. 5. Miscellaneous process improvements

Details

1 Office, 2 Stories Above Grade, 4,582 SF New Construction, Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Rugs and Mats, Office Furniture, Institutional Furniture, Laboratory Furniture.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents