Similar Projects
Brannon Road Sidewalk
Infrastructure
Bidding
Cumming, GA 30041

As-Needed Emergency Water And Sewer Repairs
Post-Bid
Cumming, GA

FY 2021 Sanitary Sewer Improvements Project
Infrastructure
Post-Bid
Gainesville, GA

North Point Parkway LID Streetscape Enhancement and Upgrade
Results
Alpharetta, GA

Trail Top Coating for Chattahoochee Pointe
Results
Less than $40,000 est. value
Suwanee, GA 30024

Greenway Maintenance as Needed
Infrastructure
Post-Bid
GA

Pilgrim Mill Road Multi-Use Trail Design/Environmental Services
Results
Less than $3,500,000 est. value
Cumming, GA

Gillsville Highway Pump Station, Force Main and Gravity Sewers
New Construction, Infrastructure
Post-Bid
Gainesville, GA

Old Atlanta Highway Phase 4 and 5
Results
Cumming, GA

Gravel Parking Lot Maintenance
Term Contract
Post-Bid
Cumming, GA

Kendrick Lift Station Close Out
Results
Cumming, GA 30041

Cumming Utilities Shop South Parking Lot - Grading, Curb, Drainage and Paving Project
Infrastructure
Post-Bid
Cumming, GA 30040

Park Shore Pump Station, Gravity Sewer and Force Main
New Construction
Results
$4,500,000 est. value
Cumming, GA

Pedestrian Scramble at Milton Avenue and Canton/Roswell Street
Results
Alpharetta, GA

Highway 369 Georgia 400 Emergency Gravity Sewer Relocation Improvements
Results
Cumming, GA

Last Updated 04/06/2022 08:47 AM
Project Title

Alpha Loop Extension

Physical Address View project details and contacts
City, State (County) Alpharetta, GA   (Forsyth County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will extend the existing Alpha Loop from its current terminus south of Old Milton Parkway southeast to Northwinds Parkway. A location map is provided at the end of this document. The project includes, but is not limited to, the following items: The construction of 8’ to 12’ wide concrete multiuse trails. The installation of a pedestrian culvert (precast concrete) underneath Westside Parkway. The reconstruction of Westside Parkway at the culvert installation. The construction of a multiuse trail bridge. The construction of retaining walls (various types). The construction of steel-framed, concrete-decked elevated boardwalks in environmentally sensitive areas. The installation of storm drain structures and pipes. The installation of sanitary sewer manholes and pipes. The installation of conduit and fiber. The installation of lighting. Utility coordination.

Details

Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents